38
12 Commissioning
12.8 Completion
Fit the base coverplate, see diagram 12.4.
Ensure that the magnetic lighting instruction label is placed
on the surface of the boiler casing.
GB:
It is a requirement that the “Benchmark” Installation,
Commissioning and Service Record is completed and left
with the user.
IE:
it is necessary to complete a “Declaration of Conformity”
to indicate compliance to I.S.813. An example of this is given
in the current edition of I.S.813.
12.9 Instruct the User
Demonstrate, then instruct the User about the lighting
procedure and heating system controls operation.
Advise the user on the use and maintenance of any scale
reducer and pass on any relevant instructional documents.
Advise that to ensure the continued efficient and safe
operation of the boiler it is recommended that it is checked
and serviced at regular intervals. The frequency of servicing
will depend upon the installation conditions and usage, but in
general, once a year should be enough.
Draw attention, if applicable, to the current issue of the
Gas Safety (Installation and Use) Regulations, Section 35,
which imposes a duty of care on all persons who let out any
property containing a gas appliance in the UK.
The user shall not interfere with or adjust sealed components.
It is the Law that any servicing is carried out by a
competent
person
.
Advise the user that, like all condensing boilers this appliance
will produce a plume of condensation from the flue terminal
in cool weather. This is due to the high efficiency and hence
low flue gas temperature of the boiler.
Advise the user of the precautions necessary to prevent
damage to the system, boiler and the building, in the event of
the heating system being out of use during frost or freezing
conditions.
Advise the user that the permanent mains electrical supply
SHOULD NOT be switched off, as the built in frost protection
and pump/valve saver program will not operate.
Advise the User if the mains electricity and gas are to be
turned off for any long periods during severe weather, it is
recommended that the whole system, including the boiler,
should be drained to avoid the risk of freezing.
NOTE:
Contact your installation/servicing company as
draining, refilling and pressurising MUST be carried out by a
competent person
.
Leave these instructions and the ‘Benchmark’ service record
with the user.
Diagram 12.4
COVER PLATE
13538
Содержание 18sxi
Страница 30: ...30 10 Twin Flue Length Preparation and Installation Diagram 10 24 13226...
Страница 46: ...46 14 Fault Finding 13012 Diagram 14 5 CENTRAL HEATING...
Страница 48: ...48 14 Fault Finding 13447 Diagram 14 6 Fault Codes continued...
Страница 61: ...61 16 Spare Parts Diagram 15 21 13861 1 2 3 4 5 7 9 10 12 6 8 11 13...
Страница 63: ...63...