
0020107233_00 - 06/11 - Glow-worm
INSTALLATION
- 19 -
Diagram 7.1
Diagram 7.2
13506
13503
7 boiler fixing
7.1 Hanging bracket fixing
Reposition the wall template over the flue hole and mark
the position of the fixing holes for the hanging bracket, see
diagram 7.1.
Mark and drill the fixing holes and secure the hanging bracket
which is supplied in the polystyrene base pack.
noTe:
Due to the varied site conditions we do not supply
fixings and advise that the installer should supply those which
are suitable.
7.2 boiler Hanging
IMPoRTanT:
With regards to the Manual Handling
Operations, 1992 Regulations, the following lift operation
exceeds the recommended weight for a one man lift, refer to
section 15 Manual Handling.
Lifting the boiler into position, lean the top of the boiler slightly
to the wall and position just above the hanging bracket. Lower
the boiler slowly and engage onto the hanging bracket, see
diagram 7.2.
Remove the polystyrene base support.
Содержание 12 hxi G.C.No. 41-019-01
Страница 14: ...0020107233_00 06 11 Glow worm INSTALLATION 14 12342 Diagram 5 1...
Страница 21: ...0020107233_00 06 11 Glow worm INSTALLATION 21 Diagram 8 3 13000...
Страница 32: ...0020107233_00 06 11 Glow worm MAINTENANCE 32 Diagram 12 4 13456...
Страница 33: ...0020107233_00 06 11 Glow worm MAINTENANCE 33 13012 Diagram 12 5 CENTRAL HEATING...
Страница 34: ...0020107233_00 06 11 Glow worm MAINTENANCE 34 13508 Diagram 12 6 Fault Codes...
Страница 45: ...0020107233_00 06 11 Glow worm MAINTENANCE 45...
Страница 46: ...a...