15
Installation/Operation & Maintenance Manual
GM
-
6140H 2-POST LIFT
4.4.3.2
Connect the power supply cable and end
limit switch wire to the terminal strip on the junction
box of the motor
(Fig. 37)
following the wiring
diagram on
Page 4.
Fig. 37
4.4.3.3
The wires should be fixed by nylon pitch.
4.4.3.4
Close the cover of the junction box. Press
the up push button
(Fig. 37)
, the motor rotation
direction should be the one shown by the arrow on
the pump.
BEWARE: The pump rotating for a long time in
the wrong sense may cause itself serious
damages.
4.4.3.5
Make sure that the post end limit switches
work properly by pressing them manually.
4.4.4 ARM ASSEMBLING
◆
Press the up push button, raise the carriages to
a height of about 70cm off the ground, then
press the lock push button,
CUT OFF THE
POWER SUPPLY TO THE LIFT.
◆
Grease the holes
φ
40 on the arms ends.
◆
Mount the arms into the carriage supports and
insert the dowel pins into the support holes as
shown in
Fig. 38
. Notice the entry of both arms
is the same with the entry of the vehicle.
Fig. 38
◆
Block the spring ring at the end of the pin.
WARNING
End-user should confirm that the over load
device must be connected before the electrical
power connected to lift.
4.4.5 INSTALL THE COVER PLATE
Install the cover plates at the chassis by 8 pieces
M8×16 bolts.
4.4.6 INSTALL SPRING SCREW
◆
Make 14 drills on the basement with a helical
concrete bit with a diameter of 18mm to a depth
to 130mm. Use the basis pad as a drilling
template.
◆
Install the screw according to
Fig. 30
.
4.5 TESTING AND CHECKS TO PERFORM
BEFORE START-UP
4.5.1 MECHANIAL TESTS
◆
Attachment and tightness of bolts, fittings and
connections
◆
Free sliding of moving parts
◆
Clean state of various parts of the machine
◆
Position of the protection device
◆
Arms blocking device
4.5.2 ELECTRIC TESTS
◆
Connection comply with diagrams
◆
Machine earth connections
Содержание GM - 6140H
Страница 27: ......