7
Assembly Instructions
Wall Mounted Water Bottle
Refilling Station
Attach mounting brackets to wall
• Affix stencil with tape to appropriate wall. It is recommended to use a
level to ensure the stencil is hung straight horizontally.
• Drill (9) holes appropriate for the wall anchors (75 lb. minimum each)
as indicated on the top and bottom mounting brackets on the stencil.
Use appropriate anchors for your wall type.
• Drill 2 holes appropriate for the wall anchors (75 lb. minimum each) as
indicated on the bottom support holes on the stencil. Use appropriate
anchors for your wall type.
• Remove stencil from the wall and install top and bottom brackets onto
the wall using appropriate anchors.
Hanging assembled unit to wall
• Carefully hang assembled bottle filler onto
the wall by lowering onto both top and
bottom wall mount brackets.
8
9
Note:
To comply with ADA requirements, the base of stencil must
be installed 11" to 14
3
/
4
" from the floor. See Rough-in Guide for
additional ADA requirements.
Note:
Before installing brackets to the wall, assure power source,
water line and drain aligns to opening on unit
Attach back plate
Reattach the Back Plate onto the
rear of the Bottle Filler Top Assembly
using the (3) screws previously
removed, plus (6) (H4) screws.
Unit is now ready for mounting.
CAUTION
Once assembled, do not lift unit by Bottle Filler
Top Assembly. Use two people when lifting.
Always wear work gloves when lifting
Lift
Points
H5
9X
See wall
mounting
template
Level
10
b82045fc-0b136962-90871f19-f891407c