Supplied By www.heating spares.co Tel. 0161 620 6677
Page 16
Page 17
SY
STEMA
TE
2000
2.2 INSTALLATION
2.0 INSTALLATION
HANDLING
When lifting the unit work with someone of similar build
and height if possible.
Choose one person to call the signals.
Lift from the hips at the same time, then raise the unit
to the desired level.
Move smoothly in unison.
Larger units may need team lift.
Preparation/placing the appliance in
position.
Details of the recommended positions for
termination of the first fix pipework are
provided in section 1.2 Technical Data. The
pipework can be located or its position
checked using the template provided with
each appliance. If these have been followed
installation is very simple and much quicker
than any other system. The appliance
is supplied shrink wrapped on a timber
installation base. Carrying handles are also
provided in the back of the casing.
The feed and expansion cistern complete with
ballvalve, cold feed/expansion and overflow/
warning fittings are provided in a separate
box along with the system expansion vessel. If
flexible connections have been ordered these
will also be inside the feed and expansion
cistern.
The appliance should be handled carefully to
avoid damage and the recommended method
is shown opposite. Before installation the
site requirements should be checked and
confirmed as acceptable. The plastic cover
and protective wrapping should be removed
from the appliance and the installation base
(provided) placed in position.
The appliance can then be lifted into position
in the cupboard on top of the base and the
front panel removed by unscrewing the 2
screws and lifting the door up and out (see
opposite) ready for connection of the pipework
and electrical supplies. The feed and expansion
cistern support shall be installed ensuring that
the base is fully supported and the working
head of the appliance is not exceeded. The
recommended access for maintenance must
also be provided - see section 1.2 Technical
Data.
Note: Although the above guidance is
provided any manual handling/lifting
operations will need to comply with the
requirements of the Manual Handling
Operations Regulations issued by the H.S.E.
The appliance can be moved using a sack
truck on the rear face although care should be
taken and the route should be even.
In apartment buildings containing a number
of storeys we would recommend that
the appliances are moved vertically in a
mechanical lift.
If it is proposed to use a crane expert advice
should be obtained regarding the need for
slings, lifting beams etc.
Содержание SysteMate 125
Страница 8: ...Supplied By www heating spares co Tel 0161 620 6677 Page 8 1 0 DESIGN 1 2 TECHNICAL DATA ...
Страница 31: ...Supplied By www heating spares co Tel 0161 620 6677 Page 31 SYSTEMATE 2000 3 0 SERVICING ...
Страница 40: ...Supplied By www heating spares co Tel 0161 620 6677 Page 40 ...
Страница 41: ...Supplied By www heating spares co Tel 0161 620 6677 ...
Страница 42: ...Supplied By www heating spares co Tel 0161 620 6677 ...
Страница 43: ...Supplied By www heating spares co Tel 0161 620 6677 ...
Страница 44: ...Supplied By www heating spares co Tel 0161 620 6677 ...