background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

Page 38

Page 39

SY

STEMA

TE 

2000

(f) nothing in these Conditions shall confer on the purchaser any rights or remedies to which the purchaser 
would not otherwise be legally entitled.
(6) Notwithstanding any other provision contained herein the Purchaser's hereby agree to fully indemnify 
us against any damages losses costs claims or expenses incurred by us in respect of any claim brought 
against us by any third party for :-
(a) any loss injury or damage wholly or partly caused by any goods supplied by us or their use.
(b)  any  loss  injury  or  damage  wholly  or  partly  caused  by  the  defective  installation  or  sub-standard 
workmanship or materials used in the installation of any goods supplied by us.
(c) any loss injury or damage in any way connected with the performance of this contract.
PROVIDED that this paragraph (6) will not require the Purchaser to indemnify us against any liability for our 
own acts of negligence or those of our employees agents or sub-contractors.
FURTHER in the case of goods supplied by us which are re-sold to and installed by a third party by the 
Purchaser  it  will  be  the  sole  responsibility  of  the  Purchaser  to  test  the  goods  immediately  after  their 
installation to ensure that inter alia they are correctly installed and are in proper working order, and are 
not likely to cause any loss injury or damage to any person or property.

10. VARIATION OF WARRANTY AND EXCLUSION
Should  our  warranty  and  exclusion  be  unacceptable  we  are  prepared  to  negotiate  for  variation  in 
their terms but only on the basis of an increase in the price to allow for any additional liability or risk 
which may result from the variation.
Purchasers  are  advised  to  insure  against  any  risk  or  liability  which  they  may  incur  and  which  is  not 
covered by our warranty.

11. RISK AND RETENTION OF TITLE
(a)  goods  supplied  by  us  shall  be  at  the  Purchaser's  risk  immediately  upon  delivery  to  the  Purchaser 
or  into  custody  on  the  Purchaser's  behalf  or  to  the  Purchaser's  Order.    The  Purchaser  shall  effect 
adequate insurance of the goods against all risks to the full invoice value of the goods, such insurance 
to  be  effective  from  the  time  of  delivery  until  property  in  the  goods  shall  pass  to  the  Purchaser 
as herinafter provided.
(b)  property  in  the  goods  supplied  hereunder  will  pass  to  the  Purchaser  when  full  payment  has  been 
made by the Purchaser to us for :-
(i) the goods of the subject of this contract.
(ii)  all  other  goods  the  subject  to  of  any  other  contract  between  the  Purchaser  and  us  which,  at  the 
time  of  payment  of  the  full  price  of  the  goods  sold  under  this  contract,  have  been  delivered  to  the 
Purchaser but not paid for in full.
(c)  until  property  in  the  goods  supplied  hereunder  passes  to  the  Purchaser  in  accordance  with 
paragraph (2) above.
(i) the Purchaser shall hold the goods in a fiduciary capacity for us and shall store the same separately 
from  any  other  goods  in  the  Purchaser's  possession  and  in  a  manner  which  enables  them  to  be 
identified as our goods.
(ii) the Purchaser shall immediately return the goods to us should our authorised representative so request.  
All the necessary incidents associated with a fiduciary relationship shall apply.
(d)  the  Purchaser's  right  to  possess  the  goods  shall  cease  forthwith  upon  the  happening  of  any  of 
the following events, namely :-
(i)  if  the  Purchaser  fails  to  make  payment  in  full  for  the  goods  within  the  time  stipulated  in  clause 
4 hereof.
(ii)  if  the  Purchaser,  not  being  a  company,  commits  any  act  of  bankruptcy,  makes  a  proposal  to  his 
or  her  creditors  for  a  compromise  or  does  anything  which  would  entitle  a  petition  for  a  Bankruptcy 
Order to be presented.
(iii)  if  the  Purchaser,  being  a  company,  does  anything  or  fails  to  do  anything  which  would  entitle  an 
adminstrator or an adminstrative receiver or a receiver to take possession of any assets or which would 
entitle any person to present a petition for winding up or to apply for an adminstration order.
(e) the Purchaser hereby grants to us an irrevocable licence to enter at any time any vehicle or premises 
owned or occupied by the Purchaser or in the possession of the Purchaser for the purposes of repossessing 
and recovering any such goods the property in which has remained in us under paragraph (2) above.  
We  shall  not  be  responsible  for  and  the  Purchaser    will  indemnify  us  against  liability  in  respect  of 
damage  caused  to  any  vehicle  or  premises  in  such  repossession  and  removal  being  damaged  which 
it was not reasonably practicable to avoid.
(f)  notwithstanding  paragraph  (3)  hereof  and  subject  to  paragraph  (7)  hereof,  the  Purchaser  shall  be 
permitted to sell the goods to third parties in the normal course of business.  In this respect the Purchaser 
shall act in the capacity of our commission agent and the proceeds of such sale :-
(i) shall be held in trust for us in a manner which enables such proceeds to be identified as such, and :
(ii) shall not be mixed with other monies nor paid into an overdrawn bank account.
We,  as  principal,  shall  remunerate  the  Purchaser  as  commission  agent  a  commission  depending  upon 
the  surplus  which  the  Purchaser  can  obtain  over  and  above  the  sum,  stipulated  in  this  contract  of 
supply which will satisfy us.
(g) in the event that the Purchaser shall sell any of the goods pursuant to clause (6) hereof, the Purchaser 
shall  forthwith  inform  us  in  writing  of  such  sale  and  of  the  identity  and  address  of  the  third  party 
to whom the goods have been sold.
(h) if, before property in the goods passes to the Purchaser under paragraph (2) above the goods are or 
become  affixed  to  any  land  or  building  owned  by  the  Purchaser  it  is  hereby  agreed  and  declared 
that  such  affixation  shall  not  have  the  effect  of  passing  property  in  the  goods  to  the  Purchaser.  
Furthermore  if,  before  property  in  the  goods  shall  pass  to  the  Purchaser  under  paragraph  (2)  hereof, 
the  goods  are  or  become  affixed  to  any  land  or  building  (whether  or  not  owned  by  the  Purchaser), 
the Purchaser  shall:-
(i)  ensure  that  the  goods  are  capable  of  being  removed  without  material  injury  to  such  land  or 
building.
(ii)  take  all  necessary  steps  to  prevent  title  to  the  goods  from  passing  to  the  landlord  of  such  land 
or building.
(iii)  forthwith  inform  us  in  writing  of  such  affixation  and  of  the  address  of  the  land  or  building 
concerned.

The Purchaser warrants to repair and make good any damage 
caused  by  the  affixation  of  the  goods  to  or  their  removal 
from  any  land  or  building  and  to  indemnify  us  against  all 
loss  damage  or  liability  we  may  incur  or  sustain  as  a  result 
of affixation or removal.
(i) in the event that, before property in the goods has passed to 
the Purchaser under paragraph (2) hereof, the goods or any of 
them are lost, stolen, damaged or  destroyed :-
(i)  the  Purchaser  shall  forthwith  inform  us  in  writing  of 
the  fact  and  circumstances  of  such  loss,  theft,  damage  or 
destruction.
(ii) the Purchaser shall assign to us the benefit of any insurance 
claim  in  respect  of  the  goods  so  lost,  stolen,  damaged  or 
destroyed.

12. NON-PAYMENT
If the Purchaser shall fail to make full payment for the goods 
supplied  hereunder  within  the  time  stipulated  in  clause  4 
hereof or be in default of payment for any other reason then, 
without  prejudice  to  any  of  our  other  rights  hereunder,  we 
shall be entitled to stop all deliveries of goods and materials 
to  the  Purchaser,  including  deliveries  or  further  deliveries  of 
goods under this contract.  In addition we shall be entitled to 
terminate all outstanding orders.

13. RISK
All goods sold by us shall be at the sole risk of the Purchaser from 
the date of despatch by us of the invoice for their price.

14. VALUE ADDED TAX
All  prices  quoted  are  exclusive  of  Value  Added  Tax  which 
will  be  charged  at  the  rate  ruling  at  the  date  of  despatch 
of invoice.

15. TRADE SALES ONLY
We are only prepared to deal with those who are not consumers 
within  the  terms  of  the  Unfair  Contract Terms  Act  1977,  the 
Sale of Goods Act 1979 and the Supply of Goods and Services 
Act 1982.  Accordingly any person who purchases from us shall 
be  deemed  to  have  represented  that  he  is  not  a  consumer 
by so purchasing.

16. JURISDICTION
The agreement is subject to English/Scots law and any dispute 
arising  hereunder  shall  be  settled  in  accordance  therewith 
dependent upon the location.

Содержание SysteMate 125

Страница 1: ... SEALED CENTRAL HEATING AND MAINS PRESSURE HOT WATER SUPPLY SYSTEM INCORPORATING A THERMAL STORE ALL MODELS COMPLY WITH THE WATER HEATER MANUFACTURERS SPECIFICATION FOR HOT WATER ONLY THERMAL STORES SYSTEMATE 2000 SYSTEMATE 2000 Gas Council Approved Reference Numbers SysteMate 125 97 317 26 SysteMate 145 97 317 27 SysteMate 185 97 317 28 SysteMate 210 97 317 29 SysteMate 225 97 317 30 ...

Страница 2: ...roduct is manufactured under a BS EN ISO 9002 Quality System audited by BSI Patents Pending TheGledhillGroup sfirstpriorityistogivea high quality service to our customers Quality is built into every Gledhill product and we hope you get satisfactory service from Gledhill If not please let us know As part of the industry wide Benchmark Initiative all Gledhill SysteMates now include a Benchmark Insta...

Страница 3: ...y i e central heating system The SysteMate 2000 is not covered by section G3 of the current Building Regulations and is therefore not notifiable to Building Control The information in this manual is provided to assist generally in the selection of equipment The responsibility for the selection and specification of the equipment must however remain that of the customer and any Designers or Consulta...

Страница 4: ...t temperature of the domestic hot water is maintained by a printed circuit board which controls the speed of the pump circulating the primary water from the store through the plate heat exchanger Because of the innovative method of hot water production no in line scale reducer is normally required on the cold supply to the appliance If scale should become a problem the plate heat exchanger is easi...

Страница 5: ...o t p u e z i s r e l i o b x a M k 5 1 W k 0 2 W k 5 2 W k 0 3 W k 5 3 W h c t i w S W k 9 W k 9 W k 9 W k 9 W k 9 s e p y t g n i l l e w D l a c i p y T s m o o r d e B 3 1 3 2 4 2 5 3 6 4 s m o o r h t a B 1 1 2 1 2 2 3 4 r e w o h s e t i u s n E 1 2 1 4 2 4 2 0 1 2 TECHNICAL DATA Notes 1 The SysteMate 225 appliance is suitable for use in large properties because it produces the same peak hou...

Страница 6: ...mplete with cold feed open vent pipework assembly is supplied separately Optional Extra Equipment A soft water model is available for areas where the hardness level is below 200 p p m mg ltr Flexible connection kit for use in connection with suitable push fit connectors for quick connection to first fix pipe installation Switch emergency electrical back up for hot water and or heating in the event...

Страница 7: ...C 5 2 1 M S m m 0 4 1 1 m m 5 9 5 m m 5 9 5 5 4 1 M S m m 0 4 1 1 m m 5 9 5 m m 5 9 5 5 8 1 M S m m 0 5 3 1 m m 5 9 5 m m 5 9 5 0 1 2 M S m m 5 9 4 1 m m 5 9 5 m m 5 9 5 5 2 2 M S m m 0 7 6 1 m m 5 9 5 m m 5 9 5 S N O I S N E M I D D R A O B P U C M U M I N I M l e d o M t h g i e H h t d i W h t p e D F D E 5 2 1 M S m m 0 9 8 1 m m 0 0 7 m m 0 0 6 5 4 1 M S m m 0 9 8 1 m m 0 0 7 m m 0 0 6 5 8 1 ...

Страница 8: ...Supplied By www heating spares co Tel 0161 620 6677 Page 8 1 0 DESIGN 1 2 TECHNICAL DATA ...

Страница 9: ...ied By www heating spares co Tel 0161 620 6677 Page 9 SYSTEMATE 2000 1 2 TECHNICAL DATA PERFORMANCE GRAPHS OF GRUNDFOS PUMPS 1 0 DESIGN GRUNDFOS 15 50 GRUNDFOS 15 60 litres sec 6 litres sec Note 1mW G 10kPa ...

Страница 10: ...he cold inlet should be removed No check valve or similar device should be fitted on the cold water supply branch to the SysteMate 2000 Because of the innovative method of hot water production no scale reducer is required on the branch to the appliance However to comply with the Benchmark Guidance Note for Water Treatment in Heating and Hot Water Systems the installer should check the hardness lev...

Страница 11: ...at plastic pipework systems can be used in place of copper internally as long as the chosen system is recommended for use on domestic hot and cold water systems by the manufacturer and is installed fully in accordance with their recommendations This is particularly important in relation to use of push fit connections when using the optional flexible hose kits see 2 2 Installation Pipework connecti...

Страница 12: ...be used for sizing the heating circuit pipework 1 3 SYSTEM DETAILS For example At 24 litres min primary flow rate the pressure loss through the SysteMate 2000 model SM210 coil and fittings is 2 1m W G 21kPa The maximum pump head available at 24 litres min and setting 3 is 3 2m H2 O 32kPa therefore 1 1m W G 11kPa is available for the boiler circuit With sealed heating systems air is released during...

Страница 13: ... systems in this manual are generally based on the use of BS EN Standard copper pipework and fittings However we are happy that plastic pipework systems can be used in place of copper internally as long as the chosen system is recommended for use on domestic heating systems by the manufacturer and is installed fully in accordance with their recommendations We always recommend the use of barrier pi...

Страница 14: ...uired at the lockshield valves on the radiators If this is not done the performance of the SysteMate will be adversely affected Heating System Connection of Bathroom Radiator Towel Rail for Summer use 1 0 DESIGN 1 3 SYSTEM DETAILS Boiler sited above the SysteMate or with dipped flow and return pipes A gravity check valve should be fitted in the boiler return pipework to prevent gravity circulation...

Страница 15: ...reased load Full details of the requirements are provided in Section 2 1 Site Requirements and 2 2 Installation Otherwise the design requirements are the same as the standard appliance Switch can operate on hot water or hot water and heating modes In the former only hot water pump and electric heating element are energized In the latter the heating system pump is also energized This means that the...

Страница 16: ...ble location will be needed for the separate feed and expansion cistern and expansion vessel This will often be at high level in the cupboard housing the SysteMate2000 Thedimensions and clearances are provided in section 1 2Technical Data The location will need to provide a suitable route for the cold feed expansion pipe and the open safety vent pipe for the appliance as well as the connecting pip...

Страница 17: ... should be handled carefully to avoid damage and the recommended method is shown opposite Before installation the site requirements should be checked and confirmed as acceptable The plastic cover and protective wrapping should be removed from the appliance and the installation base provided placed in position The appliance can then be lifted into position in the cupboard on top of the base and the...

Страница 18: ... Speedfit Yorkshire Tectite However as similar assurances cannot be obtained for Polypipe fittings we cannot recommend their use Connections A B D E F G H I and L are plain ended copper pipe Connections C J are compression fittings Connection K is a RC1 2 1 2 BSPT internal A Safety open vent B Cold feed expansion C Expansion vessel pipe D Central heating flow E Central heating return F Primary flo...

Страница 19: ...lation in case they have been loosened during transit The fittings for the feed and expansion cistern should be installed following the instructions provided by the manufacturer in a position to suit the particular location and the cistern fitted on its supports base The cold feed expansion and safety open vent should be installed between the appliance and the feed and expansion cistern Combined f...

Страница 20: ...plied By www heating spares co Tel 0161 620 6677 Page 20 WIRING DIAGRAM STANDARD SYSTEMATE 2000 APPLIANCE 2 0 INSTALLATION 2 2 INSTALLATION Y E K L B E U L B R B N W O R B Y G W O L L E Y N E E R G R D E R ...

Страница 21: ... wiring panel ElectricalConnection StandardAppliance The SysteMate 2000 is pre wired to a 12 way terminal strip from the A C B and plumbers are well able to complete the electrical installation provided they adhere strictly to the IEE Requirements for Electrical Installations BS 7671 A schematic arrangement of the wiring is shown on page 24 All the terminals are suitably labelled Note Do not attem...

Страница 22: ...ome loose during transit Frost Protection When frost protection is required for the whole house or where a base temperature is required during cold weather then a frost thermostat should be wired across plug in terminals 21 and 23 on the A C B board An alternative to fitting a frost thermostat would be to set the programmer to constant during the time required and adjust the room thermostat to a s...

Страница 23: ...s co Tel 0161 620 6677 Page 23 SYSTEMATE 2000 2 0 INSTALLATION 2 2 INSTALLATION WIRING DIAGRAM SYSTEMATE2000 WITH SWITCH Y E K L B E U L B R B N W O R B Y G W O L L E Y N E E R G R D E R K L B K C A L B Y W O L L E Y H W E T I H W ...

Страница 24: ... cable provided through the service slot provided in the base of appliance and connect to the isolator as follows red live black neutral green yellow earth Check the cables are secure in the grips provided below the terminal strip and ensure they are not in contact with any hot surfaces The recommendations contained under Electrical Connection Standard Appliance should be followed when connecting ...

Страница 25: ...ails of the requirements are given in PAS 33 1999 under Section 10 Commissioning When using either cleansing or corrosion inhibitor chemical the manufacturers instructions must be followed Cleansing the Primary System It is very important to ensure that the Primary system is cleaned using a suitable cleansing agent such as Sentinel X300 or Fernox Superfloc to ensure that any flux residues installa...

Страница 26: ...on the A C B shown opposite 1 Set the boiler thermostat to MAXIMUM 2 Switch off heating on the clock programmer and room thermostat 3 Check the jumper settings are correct Thesemustallbeinthecorrectpositions for the appliance to work correctly see opposite for options 4 Switch on the mains supply The A C B will automatically commission itself to suit the sytem boiler and the dot after the ON the L...

Страница 27: ...d to be allowed for this to happen during initial commissioning This will vary depending on the boiler size and the model of the SysteMate 2000 being used 2 Once a temperature of 64 C has been reached on the thermal store switch on space heating clock programmer and room thermostat Horizontal LED bar 1 HT will light Green LED 3 on the A C B will switch on Heating pump will run 3 Switch off space h...

Страница 28: ...ust the ballvalve so that the water level in the appliance F E cistern when the system is cold is correct and does not overflow when the appliance is at maximum temperature DO turn down the servicing valve for the ballvalve in the F E cistern once the system is finally filled to the point where the warning overflow pipe will cope with the discharge arising from a ballvalve failure DO make sure tha...

Страница 29: ...obtained direct from Gledhill using the Speed Spares service or throughanyofthelargerplumbersmerchants specialist heating spares suppliers Help and advice is also available from the Technical Helpline on 01253 474401 However allcomponentsarereadilyaccessible and can be changed quickly and easily by the installer using common plumbing practice If it is necessary to replace any of the pumps fitted t...

Страница 30: ... C A d r a o b l o r t n o c e c n a i l p p A k o l E 5 5 2 B X 8 5 1 9 3 E 1 1 r o s n e s e r o t S k o l E 9 4 1 T G 2 2 0 6 2 E 2 1 r o s n e s n r u t e r E H P k o l E 3 5 1 T G 4 2 0 6 2 E 3 1 r o s n e s e r u t a r e p m e t W H D k o l E 3 5 1 T G 4 2 0 6 2 E 4 1 k c o l c l a c i n a h c e m o r t c e l E n i l s s a r G 5 1 2 B X 3 7 8 5 8 3 5 1 k c o l c l a t i g i D n i l s s a r G...

Страница 31: ...Supplied By www heating spares co Tel 0161 620 6677 Page 31 SYSTEMATE 2000 3 0 SERVICING ...

Страница 32: ...he appliance F E cistern and vent the pump if necessary Water hammer loose pipework and or tap washers 2 Causes of Unsatisfactory Hot Water Service Check that the SysteMate is full of water i e level of water in the appliance F E cistern is correct when system is cold Check boiler thermostat this should be set at maximum Check that the boiler flow temperature is adequate when it stops firing Boile...

Страница 33: ... visit from the manufacturer the installer must have the completed Benchmark commissioning service record sheet to hand to enable help to be provided InadditiontothemainLEDdisplaytheACBhas four green LED S which can be used to check a supply is being provided when required to the Boiler LED 1 Boiler pump LED 2 and Heating pump LED 3 LED 4 is not used on this appliance The following procedure shoul...

Страница 34: ...ing Range In Line regulators as in Option 4 for Taps Mixers APPENDIX A WATER SAVINGS OPTIONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or external threads on their noses AntiVandal models also available 2 MR05 T Range Internal Regulators Push fit into Tap or Mixer seats Produced in three sizes 12 5mm BS1010 12mm ...

Страница 35: ...d in another cupboard close to the appliance if required 0 5 0 P I M e d o C k c o t S 1 e p y t d l o f i n a M m o o r k a o l c e n o m o o r r e w o h s e t i u s n e e n o m o o r h t a b e n o r o t a l u g e r w o l F e t u n i m s e r t i l g n i t t i f l a n i m r e T s t e l t u o d l o f i n a m r e t a w t o H y t i t n a u Q s t e l t u o d l o f i n a m r e t a w d l o C y t i t n a...

Страница 36: ... for plastic pipework in table 2 r e p p o c m m 5 1 n i h t g n e l e p i p t n e l a v i u q e m u m i x a M 1 e l b a T e r u s s e r p t e l n I r a b m e p i p f o h t n e l t n e l a v i u q e m u m i x a M m l 8 m l 0 1 m l 8 1 0 2 3 3 3 1 5 5 2 0 1 1 5 4 7 1 0 3 0 0 2 0 8 0 3 e p i p c i t s a l p n i s h t g n e l e p i p t n e l a v i u q e m u m i x a M 2 e l b a T e r u s s e r p t e l...

Страница 37: ...ved and the actual connection of fittings to the manifold will need to suit the arrangements shown in page 35 Note 1 If it is proposed to fit chemical water treatment such as a water softener this should be fitted in this location and the cold water branch in the sink should be branched off the cold water main prior to the treatment device instead of the cold water manifold Any other isolating con...

Страница 38: ... AND FURTHER we will meet the contractors installers reasonable costs in removing and replacing any defective Open Vented Copper Cylinder or Tank with defective integral pipework as follows Gledhill Water Storage Ltd AMD AUGUST 2000 Where we agree to rectify any defect we reserve the right to undertake the work on our own premises Provided that our product has been installed in accordance with any...

Страница 39: ... to enter at any time any vehicle or premises owned or occupied by the Purchaser or in the possession of the Purchaser for the purposes of repossessing and recovering any such goods the property in which has remained in us under paragraph 2 above We shall not be responsible for and the Purchaser will indemnify us against liability in respect of damage caused to any vehicle or premises in such repo...

Страница 40: ...Supplied By www heating spares co Tel 0161 620 6677 Page 40 ...

Страница 41: ...Supplied By www heating spares co Tel 0161 620 6677 ...

Страница 42: ...Supplied By www heating spares co Tel 0161 620 6677 ...

Страница 43: ...Supplied By www heating spares co Tel 0161 620 6677 ...

Страница 44: ...Supplied By www heating spares co Tel 0161 620 6677 ...

Отзывы: