6
Push the Handle of the Gauge and Lever
Assembly (ITEM 22) to its lowest position
and insert the upper end of the Control
Rod (ITEM 25) into the hole at the rear of
the Handle.
Take off one of the nuts (ITEM 32) on
the Control Rod (ITEM 25) and insert the
threaded end into the angled bracket
of the Pivot Bracket Assembly (ITEM 18).
affix the nut back onto the thread of the
Control Rod.
H.
Take the Rod of the Pivot Bracket
Assembly (ITEM 18) and insert the
threaded end into the Flow Control Plate
(ITEM 26) located on the underside of
the Hopper (ITEM 23).
Ensure 6mm Washer (ITEM 33 - 2off) and
M6 Nut (ITEM 32 - 2off) are positioned
on either side of the Flow Control Plate
when securing the assembly in position.
To complete the assembly, insert the R Clip (ITEM 27)
into the hole in the vertical shaft of the Gear Box and
Axle Assembly (ITEM 2) from the inside of the Hopper
(ITEM 23).
Before use, push the Lever (ITEM 22) downwards to
close the apertures in the base of the Hopper (ITEM
23) and pull the Lever upwards to open the apertures.
If the apertures in the base of the Hopper do not align
with the apertures in the Flow Control Plate (ITEM 26),
adjust the position of the two nuts along the threaded
Control Rod (ITEM 25) - See drawings in Diagram H.
Once the apertures are aligned, fully tighten both
nuts. To limit the size of the open apertures when
operating the Lever, move the position of the Wing
Nut.
I.
ITEM 25
ITEM 22
ITEM 18
ITEM 26
ITEM 18
ITEM 32
ITEM 27
OPEN
CLOSED
ITEM 22
CLOSED
ITEM 23
ITEM 25
ITEM 23
ITEM 32
ITEM 33