background image

6

Push the Handle of the Gauge and Lever 

Assembly (ITEM 22) to its lowest position 

and insert the upper end of the Control 

Rod (ITEM 25) into the hole at the rear of 

the Handle.

Take off one of the nuts (ITEM 32) on 

the Control Rod (ITEM 25) and insert the 

threaded end into the angled bracket 

of the Pivot Bracket Assembly (ITEM 18). 

affix the nut back onto the thread of the  

Control Rod.

H.

Take the Rod of the Pivot Bracket 

Assembly (ITEM 18) and insert the 

threaded end into the Flow Control Plate 

(ITEM 26) located on the underside of 

the Hopper (ITEM 23). 

Ensure 6mm Washer (ITEM 33 - 2off) and 

M6 Nut (ITEM 32 - 2off) are positioned 

on either side of the Flow Control Plate 

when securing the assembly in position.

To complete the assembly, insert the R Clip (ITEM 27) 

into the hole in the vertical shaft of the Gear Box and 

Axle Assembly (ITEM 2) from the inside of the Hopper 

(ITEM 23).

Before use, push the Lever (ITEM 22) downwards to 

close the apertures in the base of the Hopper (ITEM 

23) and pull the Lever upwards to open the apertures.

If the apertures in the base of the Hopper do not align 

with the apertures in the Flow Control Plate (ITEM 26), 

adjust the position of the two nuts along the threaded 

Control Rod (ITEM 25) - See drawings in Diagram H.

Once the apertures are aligned, fully tighten both 

nuts. To limit the size of the open apertures when 

operating the Lever, move the position of the Wing 

Nut.

I.

ITEM 25

ITEM 22

ITEM 18

ITEM 26

ITEM 18

ITEM 32

ITEM 27

OPEN

CLOSED

ITEM 22

CLOSED

ITEM 23

ITEM 25

ITEM 23

ITEM 32

ITEM 33

Содержание ICEMASTER 25

Страница 1: ...r INSTRUCTION LEAFLET IMPORTANT NOTICE This machine is designed to spread dry granular material only IT WILL NOT SPREAD WET OR DAMP SALT PLEASE MAKE THIS MANUAL AVAILABLE TO ALL PERSONNEL WHO WILL USE OR MAINTAIN THIS BROADCAST SPREADER ...

Страница 2: ...FLAT WASHER QTY 1 ITEM 17 HANDLE SHAFT QTY 1 1 2 4 4 3 11 6 6 7 8 8 9 10 8 5 13 5 15 15 16 18 24 19 19 20 9 22 23 28 25 26 ITEM 18 PIVOT BRACKET ASSEMBLY QTY 1 ITEM 19 UPPER HANDLE QTY 2 ITEM 20 HANDLE SPACER QTY 1 ITEM 21 6MM FLAT WASHER QTY 3 ITEM 22 GUAGE AND LEVER ASSEMBLY QTY 1 ITEM 23 HOPPER ASSEMBLY QTY 1 ITEM 24 M6 X 45MM BOLT QTY 5 ITEM 25 CONTROL ROD QTY 1 ITEM 26 FLOW CONTROL PLATE QTY ...

Страница 3: ... 2 OFF Ensure the following components have been received SPINNER PLATE ITEM 1 1 OFF GEARBOX AND AXLE ASSEMBLY ITEM 2 1 OFF FRAME BRACE ITEM 6 2 OFF WHEEL ASSEMBLY FRAME ITEM 4 2 OFF INC ITEM 5 2 OFF HOPPER FRAME ITEM 7 1 OFF CONNECTOR ROD ITEM 10 1 OFF WHEELS ITEM 12 2 OFF GRILLE ITEM 28 1 OFF CONTROL ROD ITEM 25 1 OFF INC ITEM 32 2 OFF INC ITEM 33 2 OFF HOPPER ASSEMBLY ITEM 23 1 OFF INC ITEM 26 ...

Страница 4: ... off through each Wheel Assembly Frame ITEM 4 and Hopper Frame ITEM 7 Secure in position using M6 Lock Nut ITEM 9 2 off Do not fully tighten yet IMPORTANT HOLE C Insert the Spinner Plate ITEM 1 onto the vertical shaft of the Gear Box and Axle Assembly ITEM 2 Insert the M4 x 20mm Screw ITEM 3 to secure the Spinner Plate in position Turn the Hopper ITEM 23 upside down and attach it to the Hopper Fra...

Страница 5: ...ld be prefitted inside the Wheel Assembly Frame ITEM 4 Slide the Inner Axle Bush until it slots inside the Axle Bush in the Frame Fit the remaining Inner Axle Bush onto the left side of the Axle Again slot the bushes together snugly Fit the Wheels ITEM 12 2 off onto the Axle Begin with the right hand Wheel and secure in place using the M5 x 45mm Bolt ITEM 13 and M5 Lock Nut ITEM 14 Tap on the Axle...

Страница 6: ... side and the Handle Lever is facing forward Secure in position using M6 x 45mm Bolt 2 off 6mm Flat Washer 2 off and M6 Lock Nut 2 off ITEMS 24 21 and 9 ITEM 17 G Insert the Handle Shaft ITEM 17 between the two Wheel Assembly Frames ITEM 4 ensuring the Handle Shaft is in the correct orientation The lower holes are further from the end of the Handle Shaft Take the Pivot Bracket Assembly ITEM 18 and...

Страница 7: ...late when securing the assembly in position To complete the assembly insert the R Clip ITEM 27 into the hole in the vertical shaft of the Gear Box and Axle Assembly ITEM 2 from the inside of the Hopper ITEM 23 Before use push the Lever ITEM 22 downwards to close the apertures in the base of the Hopper ITEM 23 and pull the Lever upwards to open the apertures If the apertures in the base of the Hopp...

Страница 8: ...d periods of time salt is hygroscopic it will absorb moisture in the air and can set hard like concrete Periodically check all fixtures and fittings for tightness Rinse dry inside and outside of the spreader after each use Move the Flow Control Lever and Spinner Plate as you rinse to avoid build up of material Spray with maintenance spray e g WD40 which will drive out highly corrosive saltwater fr...

Отзывы: