2
©
Germann Instruments, Inc.
Test Smart – Build Right
©
Contenido
1.3 ASTM C 1202 using the Proove´it Cell PR-1000 (
1.4 ASTM C 1760 using the Proove´it Cell PR-1200 (
1.5 NT BUILD 492 using the Proove´it Cell PR-1100 (
Preparing and producing the specimens
Choosing the correct rubber gasket
Installing the gaskets without epoxy
Installing the gaskets with epoxy
Connecting the cells to the Proove’it
Microprocessor Power Supply unit
Turning on and running the system
10.1 Running the test for ASTM C 1202 and NT BUILD 492
10.2 Running the test for ASTM C 1760
Disassembling a Proove’it© cell and maintenance
Remarks on proper operation of the Proove’it
Maintenance of the vacuum pump
The PROOVE´it system is the sole property of GERMANN INSTRUMENTS A/S, Denmark
Copyright ©, All Rights Reserved.
Reproduction in any manner without the permission of GERMANN INSTRUMENTS A/S is strictly forbidden.