44
4.5
CONTROL SYSTEM SERVICING
4.5.1
CONTROL BLOCK
See Section 1.9 for Bill of Materials.
a. Remove Strainer with an alley key and flush through with water in accordance with section
b. Remove the restrictor insert with a flat head screwdriver and inspect for any blockages.
c. On reassembly, it is recommended that the O-ring seals are lightly lubricated using a WRAS
approved grease.
Содержание NeoFlow DN200
Страница 1: ...Operating instructions NeoFlow Pressure Reducing Valve DN200 DN300...
Страница 10: ...10 1 7 BILL OF MATERIALS PRESSURE REDUCING ASSEMBLY...
Страница 12: ...12 1 8 BILL OF MATERIALS VALVE BODY...
Страница 23: ...23 2 2 2 PERMITTED VALVE ORIENTATIONS Horizontal Orientation Vertical Orientation...
Страница 42: ...42...
Страница 53: ...53 NeoFlow Diagnostic Flow Chart A...
Страница 54: ...54 NeoFlow Diagnostic Flow Chart B...