45
4.5.2
PRV PILOT
Refer to Section 1.10 for Bill of Materials.
a. Wind the pilot screw anticlockwise until the loading spring force can no longer be felt.
b. Undo the eight bolts and lift the spring housing.
Содержание NeoFlow DN200
Страница 1: ...Operating instructions NeoFlow Pressure Reducing Valve DN200 DN300...
Страница 10: ...10 1 7 BILL OF MATERIALS PRESSURE REDUCING ASSEMBLY...
Страница 12: ...12 1 8 BILL OF MATERIALS VALVE BODY...
Страница 23: ...23 2 2 2 PERMITTED VALVE ORIENTATIONS Horizontal Orientation Vertical Orientation...
Страница 42: ...42...
Страница 53: ...53 NeoFlow Diagnostic Flow Chart A...
Страница 54: ...54 NeoFlow Diagnostic Flow Chart B...