52
Mounting the middle positioning kit
1. Disconnect the actuator from the supply voltage.
2. Remove the screws of the limit switches S1 and S2
3.
Connect the plug of the kit to the four-pole slot (1).
Make sure that the multipoint socket connector of the plug
fits into the socket board of the four-pole plug.
4. Attach the two switches S3 and S4 of the kit to S1 and S2. When doing
this, switch S3 (assigned to PIN1, 2) must be down and switch S4 (PIN 3,
4) on top. (see wiring diagram).
5. Fasten the two switches S3 and S4 with the longer screws supplied.
Overview on activation
Actuator moves
in position
Terminal
under current
Activated
switch
Direction of rota-
tion of the actuator
OPEN
1
S1
CCW*
CLOSED
2
S2
CW**
MIDDLE
3
S3
CCW
S4
CW
* CCW – Counter Clock Wise – Gegen Uhrzeigersinn
** CW – Clock Wise – Im Uhrzeigersin
> Move actuator to position “OPEN” (CCW): Put terminal 1 under current
> Switch S1 is activated.
> Move actuator to position “CLOSED” (CW): Put terminal 2 under current
> Switch S2 is activated.
> Move actuator to middle position (CCW / CW): Put terminal 3 under
current > Switch S3/S4 is activated.
S4
S3
(1)
Содержание EA21
Страница 33: ...69...
Страница 36: ...72 Notizen Notice Note...
Страница 37: ...73 Notizen Notice Note...