![GEZE SecuLogic RWS TZ 300 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/geze/seculogic-rws-tz-300/seculogic-rws-tz-300_installation-and-commissioning-instructions-with-wiring-diagram_2219068022.webp)
SECULOGIC TZ300
22
Wiring diagram
Notes about the wiring diagram
6.4.2
The notes apply for the following wiring diagram of the various versions of the TZ300.
1)
Building mains fuse.
2)
The primary and secondary sides must be spatially separated. For the TZ300S the PSU must be fitted externally.
3)
TZ300SN UP: Protection class II, PE (protective earth) conductor is not connected.
TZ300SN AP: Protection class I with PE conductor testing according to VDE0100.
4)
In delivery state the 2K resistor is fitted.
When connecting a BMA, GMA or RWA, remove the resistor and connect it in series with the NC contact of the
BMA, GMA or RWA (see plan “Emergency unlocking through BMA, GMA or RWA”).
5)
Contact closed when door closed.
6)
When a GEZE alarm bell or siren is fitted, a jumper must be set.
Содержание SecuLogic RWS TZ 300
Страница 41: ...SECULOGIC TZ300 41...
Страница 42: ...SECULOGIC TZ300 42...
Страница 43: ...SECULOGIC TZ300 43...