Brief instructions
GCLR-I 2000/GCLR-O 2000
6
3
Brief instructions
For installation and commissioning of the GCLR 2000 in stand-alone opera-
tion.
Step 1: Install the reader (see Chapter 4.1)
X
Heed the range of the LF scanned field when positioning the reader.
X
Adjust the range of the LF scanned field using the rotary potentiometer
"Dist" on the GCLR.
Step 2: Connect the reader (see Chapter 4.2)
X
Connect a 12–36 V DC voltage supply to the GCLR.
X
Preferably, voltage from automatic drives should be used.
X
Heed the overall current consumption.
X
Connect output "Relay 1" to the peripherals to be activated.
Step 3: Teach the transponders (see Chapter 4.3)
X
Teach the transponders using group button 1 in order to thus switch the
output "Relay 1".
4
Installation and commissioning.
4.1
Step 1: Install reader GCLR 2000
During installation, please heed the following:
X
Choose the position of the reader in such a way that the LF scanned field
produced covers the required area.
The GCLR-I 2000 is suitable for installation indoors, the GCLR-O 2000 for
installation outdoors.