Test and handover
X
Insert the cable clamp (2) of the drip loop
(1) into the drive.
a
s
X
Fasten the cable with cable safety device
(3).
X
Put the cover cap (2) back on and tighten it
with screw (1).
d
a
s
8
Test and handover
X
Check the measures taken to secure against or prevent crushing, impact, shearing and trapping points and
implement these.
X
Clean the window unit, remove dirt.
Carrying out tests
X
Following installation, check the following points:
à
Window unit is adjusted properly and works safely.
X
Have the window unit checked by an expert.
X
Check all the functions by carrying out a trial run.
Preparing risk analysis
X
Before commissioning the window unit, have a risk analysis carried out by the distributing company (expert
qualified electrician) in accordance with the Machinery Directive MLAR 2006/42/EC.
à
The “GEZE safety analysis for power-operated windows” can be used as a guide for preparation of the risk
analysis.
X
Apply CE marking to the unit in accordance with Annex III of the Machinery Directive.
Handover procedure
X
After completion, Instruct the operator in operation and use of the window unit.
X
Hand over unit documentation (wiring diagram and all mutually applicable documents) to the operator or
electrician if appropriate.
X
Have the operator instruct users (people who operate the window unit, cleaning staff etc.) on safe use and
cleaning of the window unit and point out the risks involved with the window unit.
9
Commissioning
Carrying out commissioning
Following connection to the 24V supply voltage, the drive system is ready for operation immediately and can be
controlled via the control keys. No separate commissioning or teaching run is required.
The parameter settings of the drive system can be changed using the parameter setting unit ST 220 (ID 087261)
(see chapter 10 “Parameter setting”).