24
Attention
Please check the following before fault diagnosis:
Supply voltage:
To ensure trouble-free operation, make sure all bus nodes are supplied with power via an
external 24 V DC SELV power supply unit that is isolated from connected loads. Do not use
the bus power supply for GESTRA control units for supplying power to the SPECTOR
control
or connected equipment.
Wiring:
Does the wiring conform to the wiring diagram?
System malfunctions
Indications, diagnosis and remedies
Error
Remedy
Internal sum current of WAGO I/O module too high
If the sum of the internal power consumption exceeds the
sum current for bus modules, position a potential feed
terminal with bus power supply unit (750-613) upstream
from the module where the admissible sum current was
exceeded. This current is established during configuration
of the I/O module in the SC.
Warning alarm “WAGO I/O module:
Configuration not plausible”
Always set the correct number of established I/O
modules.
WAGO I/O module not connected
Is the node ID/baud rate correct (250kB/ID: 126)? Have you
connected the end module? Is the internal power consump-
tion adhered to?
Warning alarm “Controller xxx:
Manual mode”
The controller is in manual mode.
Warning message “Display dirty”
The IR grid is soiled. There is a cleaning tool in System/
Display.
Burner Modbus TCP communication cannot be
established
Connected to “Ether 2”? Are Modbus parameters correctly
set? See Lamtec documentation.
New CAN nodes cannot be allocated
If a CAN node was deleted from the list, this position can
only be allocated to another CAN node after you have
rebooted the SC.
Attention
■
Please pay attention to the Installation & Operating Manuals of the connected equip-
ment.
Содержание SPECTORcontrol II
Страница 18: ...18 Bringing into service Home screens ...
Страница 30: ...30 For your notes ...
Страница 31: ...31 For your notes ...