10
NRG 16-51, NRG 17-51, NRG 19-51 - USA - Installation & Operating Manual -
850692-00
Required personnel qualifications
Activity
Personnel
Integration in control system Specialist staff
Plant designer
Installation /
electrical connection/
bringing into service
Specialist staff
The equipment may only be installed, wired
and brought into service by qualified and
competent staff.
Operation
Boiler service technician
Staff trained by the plant operator.
Maintenance work
Specialist staff
Fitting and maintenance work may only be
performed by authorized staff who have
undergone specific training.
Refits
Specialist staff
Persons trained by the plant operator to work
with pressure and temperature.
Fig. 1
Notes on product liability
The manufacturer cannot accept any liability for damages resulting from improper use of the
equipment
.