14
Installation
VKE 16-1, VKE 16 A, VKE 26
VKE 16-1, VKE 16 A
Install test chamber only in horizontal pipes, see
Fig. 7
and
Fig. 8
.
Risk of death, severe injuries, damage or destruction caused by the explosion of explosive
mixtures!
An electrically insulated installation between pipe flanges may result in electrostatic
charges.
If the equipment is used in explosion-risk areas make sure that any electrostatic charges
that may be generated will be discharged (earthing).
Danger
VKE 16-1, VKE 16 A Design with flanged ends
1. Observe correct position of installation.
2. Observe direction of flow. The flow arrow is on the trap body.
3. Consider space required for servicing. When the test chamber is installed a minimum space is
required for removing the measuring electrode (see table for
Fig. 7
and
Fig. 8
).
4. Remove plastic plugs. They are only used as transit protection.
5. Clean seating surfaces of both flanges.
6. Install steam trap.
VKE 16-1 Design with screwed socket ends
1. Observe correct position of installation.
2. Observe direction of flow. The flow arrow is on the trap body.
3. Consider space required for servicing. When the test chamber is installed a minimum space is
required for removing the measuring electrode (see table for
Fig. 7
and
Fig. 8
).
4. Remove plastic plugs. They are only used as transit protection.
5. Clean thread of screwed sockets.
6. Install steam trap.
Содержание NRG 16-19
Страница 22: ...22 For your notes ...
Страница 23: ...23 For your notes ...