15
Installation
– continued –
VKE 16-1 Design with socket-weld ends
1. Observe correct position of installation.
2. Observe direction of flow. The flow arrow is on the trap body.
3. Consider space required for servicing. When the test chamber is installed a minimum space is
required for removing the measuring electrode (see table for
Fig. 7
and
Fig. 8
).
4. Remove plastic plugs. They are only used as transit protection.
5. Clean socket-weld ends.
6. Apply arc welding processes 111 and 141 in accordance with ISO 4063.
Attention
n
Only qualified welders certified e. g. according to DIN EN 287 may weld the steam trap.
n
Do
not
insulate the steam traps.
Heat treatment of welds
A subsequent heat treatment of the welds is not required.
VKE 16-1 Design with butt-weld ends
1. Observe correct position of installation.
2. Observe direction of flow. The flow arrow is on the trap body.
3. Consider space required for servicing. When the test chamber is installed a minimum space is
required for removing the measuring electrode (see table for
Fig. 7
and
Fig. 8
).
4. Remove plastic plugs. They are only used as transit protection.
5. Clean butt-weld ends.
6. Apply arc welding processes 111 and 141 in accordance with ISO 4063 or gas welding
process 3 to ISO 4063.
VKE 26
1. Remove plastic plugs. They are only used as transit protection.
2. Screw test chamber into the vent hole of the float trap.
3. Connect the gas balance pipe laterally to the test chamber.
4. Make sure the gas balance pipe is ascending.
5. Consider space required for servicing. When the test chamber is installed a minimum space is
required for removing the measuring electrode (see
Fig. 9)
.