14
If the equipment is installed in a vertical pipe the
flow arrow must point upwards.
The equipment can also be installed in
vertical pipes with downward flow.
For this purpose make sure that the
equipment is fitted with springs of type
5 VO.
If the equipment is installed downstream of a pipe
bend the eye bolt must point towards the inside of
the pipe bend.
Put a commercially available gasket that is
suitable for the pipe onto the lower flange.
Put the equipment onto the gasket.
Put a commercially available gasket that is
suitable for the pipe onto the equipment.
Put the upper flange onto it.
Insert all bolts through the holes in the flange.
Make sure that all component parts are in
central alignment with each other.
Screw the nuts onto the bolts.
To obtain the desired position of
installation you can turn the equipment
with the eye bolt.
Turn the equipment into the desired installation
position.
Tighten the nuts on the bolts evenly.
The torque required for tightening the nuts
depends on the pipe.
Содержание BB 1
Страница 1: ...Double Swing Check Valve BB 1 BB 2 BB 3 Original Installation Instructions 819649 00 ...
Страница 50: ...50 ...
Страница 51: ...51 ...