8
Vapodest 45s
4.1. Check for transport damage
Before assembling the apparatus please check if the content of the box is com-
plete and intact!
In case of any damage, please notify your carrier (post, rail, road) as well as
your supplier!
4.2. Unpack apparatus and set up
The VAPODEST must not be run in damp or hazardous location. The maximum
humidity allowed is 80 %, the maximum room temperature must not exceed 40 °C!
There should be sufficient space for the set of tanks below the work bench..
Make sure, however, that those tanks are not higher than the Vapodest!
You need a connection (cold water pipe) with 1/2 inch thread to connect it to the
water supply.
Make sure to take a faucet, which can be connected to the inlet tubing permanent-
ly. The water pressure must be at least 0,5 bar in order to activate the integrated
pressure detector.
Please observe the local water and waste regulations and those of your public
water supply company! Please note that the length of the inlet and outlet tubing
is restricted to 2 metres.
The VAPODEST 45s distillation system comes fully pre-assembled. Please unpack
the equipment with care !
1. Place the equipment on a stable work bench.
2. Unpack accessories
The exact contents of the delivery can be checked by the following list.
4 Assembly and Installation
Warnung vor
einer Gefahrenstelle