Instruction manual - ProcessX
Impulse pipe
Vent valve
Process pipe
Isolating valve
Pressure tap
5HFRPPDQGDWLRQIRUSURFHVVFRQQHFWLRQ
/LTXLGPHDVXUHPHQW
Place the transmitter below the the process
pipe.
Make piping so that gas in the impulse pipe is
not delivered to the transmitter, and incorporate
gas reservoirs as required.
3.2.3 Absolute pressure and gauge pressure transmitters (FKH and FKP)
5HPRYHWKHSURWHFWLYHFDS
7KHSURFHVVFRQQHFWLRQSRUWRIWKHWUDQVPLWWHULV¿WWHGZLWKDSURWHFWLYHFDS%HIRUHSLSLQJ
be sure to remove the cap. When removing the cap, carefully protect the threaded portion
and sealing face from damage.
&RQQHFWWKHWUDQVPLWWHUWRLPSXOVHSLSHV
:KHQXVLQJWKHPDQLIROGYDOYHLWVKRXOGEH¿[HGWRWKHWUDQVPLWWHUE\WLJKWHQLQJIRXURYDO
ÀDQJHVHWEROWV81)DQGWKHQWKHLPSXOVHSLSHVKRXOGEHFRQQHFWHGWRWKHPDQLIROG
valve. Tightening torque of 7/16-20UNF mounting bolt should be 30 to 40 Nm (3 to 4 kgf m).
,IPDQLIROGLVQRWXVHGWKHLPSXOVHSLSHVFDQGLUHFWO\VFUHZHGLQWRWKHWUDQVPLWWHU,IWKUHDG
VL]HGRHVQRWPDWFKEHWZHHQWKHWUDQVPLWWHUDQGLPSXOVHSLSHVDQRYDOÀDQJHVKRXOGEH
XVHG7LJKWHQLQJWRUTXHRI81)PRXQWLQJEROWLQDQRYDOÀDQJHVKRXOGEHWR1P
(3 to 4 kgf m).
For an absolute pressure measurement, make sure that isolating valves or manifold can be
designed for vaccum service.
3RVLWLRQRISURFHVVFRQQHFWLRQ
The position of the process connection is determined by the relationship between condition,
FKDUDFWHULVWLFVDQGPHDVXUHPHQWSRLQWRISURFHVVÀXLG
Follow the process position according to the process :
Gas measurement
Liquid measurement
Steam measurement
Upper
Lower
Upper
Lower
0 to 45° up from
the vertical
0 to 45° up from
the vertical
0 to 45° down from
the vertical