Service and Repair Manual
September 2015
Platform Controls
14
Z-34/22 Bi-Energy
Part No. 1268515
3 Locate the diode between the black/red wire
from the boom function speed controller and
the white/red wire. Disconnect the white/red
wire from the diode on the black/red wire.
4 Connect the negative lead from a multimeter
set to measure amperage to the wire
connector of the white/red wire. Connect the
positive lead of the multimeter to the diode on
the black/red wire.
5 Turn the boom function speed controller to the
creep position.
6 Set the threshold: Press down the foot switch
and move the primary boom toggle switch to
the up position. Adjust the amperage to
0.28A. Turn the threshold trimpot adjustment
screw clockwise to increase the amperage or
counterclockwise to decrease the amperage.
7 Turn the boom function speed controller to the
9 position.
8 Set the max out: Press down the foot switch
and move the primary boom toggle switch to
the down position. Adjust the amperage to
0.65A. Turn the max out trimpot adjustment
screw clockwise to increase the amperage or
counterclockwise to decrease the amperage.
9 Start a timer and simultaneously press down
the foot switch and move the primary boom
toggle switch in the down direction. Note how
long it takes to reach 0.65A.
10 Set the ramp rate: Turn the ramp rate trimpot
to obtain a 2 second delay from 0 to 0.65A.
Turn the trimpot clockwise to increase the
time or counterclockwise to decrease the
time.
11 Disconnect the leads from the multimeter and
connect the white/red wire to the diode on the
black/red wire.
Boom function speed controller specifications
Threshold
(controller turned to creep)
0.28A
Max out
(controller turned to 9)
0.65A
Ramp rate
2 seconds
Содержание Z-22 Bi-Energy
Страница 63: ...September 2015 Service and Repair Manual Manifolds Part No 1268515 Z 34 22 Bi Energy 51...
Страница 87: ...September 2015 Service and Repair Manual 75 Electrical Schematic from serial number 4800 to 5426 ANSI CSA...
Страница 90: ...Service and Repair Manual September 2015 78 Electrical Schematic from serial number 4800 to 5426 ANSI CSA...
Страница 91: ...September 2015 Service and Repair Manual 79 Electrical Schematic from serial number 4800 to 5426 CE...
Страница 94: ...Service and Repair Manual September 2015 82 Electrical Schematic from serial number 4800 to 5426 CE...
Страница 95: ...September 2015 Service and Repair Manual 83 Electrical Schematic from serial number 5427 ANSI CSA...
Страница 98: ...Service and Repair Manual September 2015 86 Electrical Schematic from serial number 5427 ANSI CSA...
Страница 99: ...September 2015 Service and Repair Manual 87 Electrical Schematic from serial number 5427 CE...
Страница 102: ...Service and Repair Manual September 2015 90 Electrical Schematic from serial number 5427 CE...
Страница 103: ...September 2015 Service and Repair Manual 91 Ground Control Box Switch Panel Wiring Diagram...
Страница 106: ...Service and Repair Manual September 2015 94 Ground Control Box Terminal Strip Wiring Diagram...
Страница 107: ...September 2015 Service and Repair Manual 95 Platform Control Box Wiring Diagram...
Страница 110: ...Service and Repair Manual September 2015 98 Power Cable Wiring Diagram...
Страница 111: ...September 2015 Service and Repair Manual 99 Drive Contactor Panel Wiring Diagram...
Страница 114: ...Service and Repair Manual September 2015 102 Manifold and Limit Switch Wiring Diagram...
Страница 115: ...September 2015 Service and Repair Manual 103 LVI BCI Option Wiring Diagram from serial number 4800 to 5426...
Страница 118: ...Service and Repair Manual September 2015 106 LVI BCI Option Wiring Diagram from serial number 5427...
Страница 119: ...September 2015 Service and Repair Manual 107 Engine Wiring Diagram...
Страница 121: ...September 2015 Service and Repair Manual Part No 1268515 Z 34 22 Bi Energy 109 Hydraulic Schem atic Hydraulic Schematic...
Страница 123: ......