
1-800-345-8207
15
15.
The nitrogen generator is now ready to fill the fire sprinkler
system to the desired supervisory pressure.
16.
Open the ball valve at the nitrogen storage tank outlet.
17.
Open the Air Maintenance Device bypass valve to begin
filling the sprinkler system. See Figure 13.
18.
Allow the sprinkler system to reach the desired pressure.
NOTE:
This should finish in 30 minutes per the desired NFPA
guidelines.
19.
As soon as sprinkler system supervisory pressure is reached,
put the sprinkler system back into service by placing the Air
Maintenance Device in the maintenance position (refer to the
air maintenance device manual for proper operation).
See Figure 14.
CAUTION
If there is more than one AMD on the system, then close the others. Fill one system at a time.
CAUTION
If there is more than one AMD on the system, fill EACH system individually and repeat steps 15 through 19
Содержание NGP-1000D-M2
Страница 2: ...2 1 800 345 8207 ...
Страница 7: ...1 800 345 8207 7 Figure 2 Typical NGP 1000D M2 M3 External View ...
Страница 31: ...1 800 345 8207 31 Section 18 Wiring Diagrams ...