Generac Power Systems 006873 Скачать руководство пользователя страница 9

Section 2: General Information and Setup

Owner’s/Installation Manual for SMM

5

Table 2-2. Lockout Switch Settings

Lockout 

Switch 

Position

Mode

Function

ON

GENERATOR

Power is NOT available on module output (contactor output). Contactor is OPEN.

ON

UTILITY

Power is available on module output (contactor output). Contactor is CLOSED.

OFF

GENERATOR

Module operates with standard load shed logic. Contactor is OPEN or CLOSED per logic.

OFF

UTILITY

Power is available on module output (contactor output). Contactor is CLOSED.

Table 2-3. LED States

State

LED State

Mode

Note

Shed

1 second flash 

(1 On – 1 Off)

Generator

Module detected an overload and shed its load. This state only
occurs in generator mode, or during a first time utility power up for
five minutes of initial operation.

Lockout 

(30 minutes)

3 second flash 

(3 On – 3 Off)

Generator

Module detected an overload while trying to recover from a shed
situation. It identified the offending load and disabled operation for 30
minutes to allow other loads to operate. This state only occurs in
generator mode.

Lockout 

Switch Active

6 second flash 

(6 On – 6 Off)

Generator

Module output is disabled and there is no power to the appliance
while in generator mode. Lockout switch must be ON. See Table 2.

Lockout 

Switch Active

ON

Utility

Lockout Switch operates in generator mode only. It has no function in
utility mode. LED is solid, indicating contactor is CLOSED and load is
connected. Lockout switch must be ON. See Table 2.

Normal

ON

Generator or Utility

Indicates contactor is CLOSED and appliance has power. This is the
default in utility mode. It is the normal operating state in generator
mode when an overload is not detected.

Test

1 second flash

Generator or Utility

Test button triggers a typical shed condition and overrides all other
states except generator lockout switch ACTIVE state.

Содержание 006873

Страница 1: ...in death or serious injury Owner s Installation Manual Smart Management Module SMM SAVE THIS MANUAL FOR FUTURE REFERENCE MODEL 006873 DATE PURCHASED ______________ WWW GENERAC COM 1 888 GENERAC 1 888...

Страница 2: ...tains or emits chemicals known to the state of California to cause cancer birth defects and other reproductive harm 000004 WARNING California Proposition 65 Engine exhaust and some of its constituents...

Страница 3: ...3 Smart Management Module 3 Smart A C Module Inside Transfer Switch 3 Know Your Smart Management Module and Carton Contents 4 Section 3 Installation Tests and Troubleshooting Electrical Specification...

Страница 4: ...Table of Contents iv Owner s Installation Manual for SMM This page intentionally left blank...

Страница 5: ...RAC RESERVES THE RIGHT TO MODIFY THIS MANUAL AT ANY TIME Safety Rules The manufacturer cannot anticipate every possible circumstance that might involve a hazard The warnings in this manual and on tags...

Страница 6: ...Section 1 Introduction and Safety 2 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 7: ...ed in a properly sized system In any combination of modules the recovery times after a loss of utility power or shutdown due to overload are shown in Table 2 1 NOTE For digital thermostats where a 24...

Страница 8: ...power See Table 2 2 NOTE Recovery time is based on priority dial settings See Table 2 1 Test Button C Disables contactor output for a specified time LED D Provides module status See Table 2 3 Contacto...

Страница 9: ...f Generator Module detected an overload while trying to recover from a shed situation It identified the offending load and disabled operation for 30 minutes to allow other loads to operate This state...

Страница 10: ...or after a shed the module will wait another 5minutes plus Priority delay before attempting to enable Note 2 The Checks power source block monitors frequency and will change state Generator or Utility...

Страница 11: ...against rain and sleet and is undamaged by the formation of ice on the enclosure 1 Turn OFF both UTILITY NORMAL and EMERGENCY STANDBY power supplies 2 Choose mounting location near electrical panel a...

Страница 12: ...ce The unit is now ready to configure apply power and perform testing Setting Priorities High priority 240 VAC loads should be set to the highest priorities so those loads recover first in the event o...

Страница 13: ...d priority time elapses each contactor will CLOSE and LED will illuminate and stay ON 7 Once LED stays ON press TEST button and verify load shed occurs 8 Once load shed occurs LED will flash at one se...

Страница 14: ...ator while attempting recovery from a shed It is in a 30 minute lockout wait period Wait 30 minutes from lockout for unit to attempt to re apply load Review all loads enabled in household The generato...

Страница 15: ......

Страница 16: ...c All rights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45...

Отзывы: