Generac Power Systems 006873 Скачать руководство пользователя страница 14

Section 3: Installation, Tests and Troubleshooting

10

Owner’s/Installation Manual for SMM

Troubleshooting

See 

Table 4

 for troubleshooting problems, causes and corrections.

Table 4. Troubleshooting

Problem

Cause

Correction

Load not powered, LED is OFF

Circuit Breaker disabled.

Enable Circuit Breaker

Load not powered, LED is OFF

MLCB disabled and generator OFF.

Enable MLCB if utility is present or verify
generator operation if outage.

Load not powered, LED flashing 1 sec-
ond interval.

Generator power just applied to unit.
Utility power just applied to unit.
Generator was overloaded and shed 
occurred.

Wait 5 minutes plus the priority time delay
(see Table 1) for unit to enable output.

Load not powered, LED flashing 3 sec-
ond interval.

This load overloaded the generator 
while attempting recovery from a shed. 
It is in a 30 minute lockout wait period.

Wait 30 minutes from lockout for unit to
attempt to re-apply load.
Review all loads enabled in household.
The generator may end up in another
overload condition when this load is
enabled. Disable some loads to prevent
generator overload from recurring.

Load not powered, LED flashing 6 sec-
ond interval.

The lockout switch is enabled and the 
unit is on generator power.

During installation, it was determined that
this load will be disabled during generator
operation to prevent generator overload.
Contact Independent Authorized Service
Dealer for details.

SMM module is humming.

NOTE: 

A normal 60 Hz hum is

expected from the normally open
contactor. Excessive hum may be
caused by one of the following:

1.

Improper mounting.

2.

Contactor error or 
connections not correct.

1.

Mount to wall or vertical
surface with arrows pointing up
only.

2.

Contact Independent 
Authorized Service Dealer.

Содержание 006873

Страница 1: ...in death or serious injury Owner s Installation Manual Smart Management Module SMM SAVE THIS MANUAL FOR FUTURE REFERENCE MODEL 006873 DATE PURCHASED ______________ WWW GENERAC COM 1 888 GENERAC 1 888...

Страница 2: ...tains or emits chemicals known to the state of California to cause cancer birth defects and other reproductive harm 000004 WARNING California Proposition 65 Engine exhaust and some of its constituents...

Страница 3: ...3 Smart Management Module 3 Smart A C Module Inside Transfer Switch 3 Know Your Smart Management Module and Carton Contents 4 Section 3 Installation Tests and Troubleshooting Electrical Specification...

Страница 4: ...Table of Contents iv Owner s Installation Manual for SMM This page intentionally left blank...

Страница 5: ...RAC RESERVES THE RIGHT TO MODIFY THIS MANUAL AT ANY TIME Safety Rules The manufacturer cannot anticipate every possible circumstance that might involve a hazard The warnings in this manual and on tags...

Страница 6: ...Section 1 Introduction and Safety 2 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 7: ...ed in a properly sized system In any combination of modules the recovery times after a loss of utility power or shutdown due to overload are shown in Table 2 1 NOTE For digital thermostats where a 24...

Страница 8: ...power See Table 2 2 NOTE Recovery time is based on priority dial settings See Table 2 1 Test Button C Disables contactor output for a specified time LED D Provides module status See Table 2 3 Contacto...

Страница 9: ...f Generator Module detected an overload while trying to recover from a shed situation It identified the offending load and disabled operation for 30 minutes to allow other loads to operate This state...

Страница 10: ...or after a shed the module will wait another 5minutes plus Priority delay before attempting to enable Note 2 The Checks power source block monitors frequency and will change state Generator or Utility...

Страница 11: ...against rain and sleet and is undamaged by the formation of ice on the enclosure 1 Turn OFF both UTILITY NORMAL and EMERGENCY STANDBY power supplies 2 Choose mounting location near electrical panel a...

Страница 12: ...ce The unit is now ready to configure apply power and perform testing Setting Priorities High priority 240 VAC loads should be set to the highest priorities so those loads recover first in the event o...

Страница 13: ...d priority time elapses each contactor will CLOSE and LED will illuminate and stay ON 7 Once LED stays ON press TEST button and verify load shed occurs 8 Once load shed occurs LED will flash at one se...

Страница 14: ...ator while attempting recovery from a shed It is in a 30 minute lockout wait period Wait 30 minutes from lockout for unit to attempt to re apply load Review all loads enabled in household The generato...

Страница 15: ......

Страница 16: ...c All rights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45...

Отзывы: