![Generac Power Systems 006873 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/generac-power-systems/006873/006873_owners-and-installation-manual_2208966013.webp)
Section 3: Installation, Tests and Troubleshooting
Owner’s/Installation Manual for SMM
9
An example configuration is shown below. Configurations
will vary depending on customer prioritization of loads:
1.
Set the priority of each SMM module as desired
(using the example configuration for reference).
2.
Apply priority decal in a suitable location on
electrical panel to record chosen priority
designations.
3.
Record priorities on decal.
Setting Lockout
Most installations will require the lockout switch to be
DISABLED. When performing a whole house backup
with a generator not sized to manage all household
loads, SMM's can be used to disable appliances or
circuits during an outage. For non-essential loads that will
not be used on generator power, set lockout switch to
ENABLED.
Tests
Utility Test
1.
Turn utility power ON and enable all module
feeding circuits.
2.
Verify LED begins to flash at one second intervals.
3.
All contactors will close after five minutes. LED will
illuminate, and stay ON.
Generator Test
1.
Simulate a utility loss by turning main line circuit
breaker (MLCB - service disconnect) OFF while
generator is in AUTO.
2.
All modules will lose power and LEDs will disable.
3.
Generator will power on after preset delay.
4.
All LEDs will flash when generator transfers.
5.
Allow each module to enable output per its priority
setting.
6.
After predefined priority time elapses, each
contactor will CLOSE and LED will illuminate and
stay ON.
7.
Once LED stays ON, press TEST button and verify
load shed occurs.
8.
Once load shed occurs, LED will flash at one
second intervals.
9.
Allow time for each module to enable contactor
output per priority setting.
10.
After predefined priority set time, each contactor
will CLOSE and LED will illuminate and stay ON.
NOTE:
Depending on load size, the SMM module may
immediately go into load shed mode or lockout during
test. In this event, remove one or more higher priority
loads to allow testing of each module.
Generator Test with Lockout Switch Enabled
(perform if Lockout Switch Enabled on any
loads)
1.
Simulate a utility loss by turning MLCB (service
disconnect) to OFF while generator is in AUTO.
2.
All modules will lose power and LEDs will disable.
3.
Generator should power on after preset delay.
NOTE:
For modules with lockout switch enabled, LEDs
will flash at six second intervals and load will remain
disabled while in generator power.
Return to Utility Test
1.
Return utility power by setting the MLCB (service
disconnect) to ON.
NOTE:
All modules should begin flashing at one second
intervals.
NOTE:
All modules will recover in five minutes (including
units with lockout switch enabled).
Installation Summary
•
Install cover on electrical panel.
•
Install covers on modules.
Priority 1 - Baseboard heat
Priority 5 - Non-essential
circuits
Priority 2 - Air conditioner
Priority 6 - Pool pump or hot
tub
Priority 3 - Range
Priority 7 - Other circuits
Priority 4 - Dryer
Priority 8 - Other circuits
Содержание 006873
Страница 4: ...Table of Contents iv Owner s Installation Manual for SMM This page intentionally left blank...
Страница 15: ......