Generac Power Systems 006873 Скачать руководство пользователя страница 11

Section 3: Installation, Tests and Troubleshooting

Owner’s/Installation Manual for SMM

7

Section 3: Installation, Tests and Troubleshooting

Electrical Specifications

Enclosure Specifications

Remove Contents from Carton

1.

Open carton.

2.

Remove and verify carton contents. 

3.

Retain carton for mounting template.

Carton Contents:

Smart Management Module (SMM)

Priority decal

Owner/Installation manual

4.

Contact the place of purchase with the unit model
number for any missing carton contents.

5.

Record date of purchase on front cover of this
manual.

Tools Needed For Installation

Power drill and suitable drill bit

Phillips and flat head screwdrivers

Mounting screws or wall anchors

Electrical materials

Voltmeter to indicate voltage presence

Mounting Instructions

The recommended installation is near the electrical panel
or appliance/load. The enclosure has a UL type 3R rating
and can be mounted indoors or outdoors. It provides a
degree of protection against rain and sleet and is
undamaged by the formation of ice on the enclosure.

1.

Turn OFF both UTILITY (NORMAL) and
EMERGENCY (STANDBY) power supplies.

2.

Choose mounting location (near electrical panel,
appliance or load to be managed).

3.

Use a flat head screwdriver to remove appropriate
knockouts from module enclosure for wiring. See A
in 

Figure 3-1

.

NOTE: 

If outdoor installation is chosen, bottom

knockouts must be used to meet NEMA 3R rating and
protect against water ingress.

4.

Hold SMM enclosure against mounting surface
with arrows pointing up, and mark or drill four
mounting holes. See B in 

Figure 3-1

 for arrows.

5.

Install SMM enclosure to mounting surface using
appropriate mounting screws or wall anchors.

Figure 3-1. Knockouts and UP Arrows

Input Voltage

240 VAC

Current Rating

50A resistive, 40A inductive

Locked Rotor Amp Rating 240A
Motor Rating

3 HP

Contactor Coil Voltage

240 VAC

UL Rating

Type 3R

Temperature

-30 to 50 deg C (-22 to 122 deg F)

Electrocution. Turn utility and emergency
power supplies to OFF before connecting 
power source and load lines. Failure to do so 
will result in death or serious injury.

 

(000116)

DANGER

000138

A

A

A

B

Содержание 006873

Страница 1: ...in death or serious injury Owner s Installation Manual Smart Management Module SMM SAVE THIS MANUAL FOR FUTURE REFERENCE MODEL 006873 DATE PURCHASED ______________ WWW GENERAC COM 1 888 GENERAC 1 888...

Страница 2: ...tains or emits chemicals known to the state of California to cause cancer birth defects and other reproductive harm 000004 WARNING California Proposition 65 Engine exhaust and some of its constituents...

Страница 3: ...3 Smart Management Module 3 Smart A C Module Inside Transfer Switch 3 Know Your Smart Management Module and Carton Contents 4 Section 3 Installation Tests and Troubleshooting Electrical Specification...

Страница 4: ...Table of Contents iv Owner s Installation Manual for SMM This page intentionally left blank...

Страница 5: ...RAC RESERVES THE RIGHT TO MODIFY THIS MANUAL AT ANY TIME Safety Rules The manufacturer cannot anticipate every possible circumstance that might involve a hazard The warnings in this manual and on tags...

Страница 6: ...Section 1 Introduction and Safety 2 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 7: ...ed in a properly sized system In any combination of modules the recovery times after a loss of utility power or shutdown due to overload are shown in Table 2 1 NOTE For digital thermostats where a 24...

Страница 8: ...power See Table 2 2 NOTE Recovery time is based on priority dial settings See Table 2 1 Test Button C Disables contactor output for a specified time LED D Provides module status See Table 2 3 Contacto...

Страница 9: ...f Generator Module detected an overload while trying to recover from a shed situation It identified the offending load and disabled operation for 30 minutes to allow other loads to operate This state...

Страница 10: ...or after a shed the module will wait another 5minutes plus Priority delay before attempting to enable Note 2 The Checks power source block monitors frequency and will change state Generator or Utility...

Страница 11: ...against rain and sleet and is undamaged by the formation of ice on the enclosure 1 Turn OFF both UTILITY NORMAL and EMERGENCY STANDBY power supplies 2 Choose mounting location near electrical panel a...

Страница 12: ...ce The unit is now ready to configure apply power and perform testing Setting Priorities High priority 240 VAC loads should be set to the highest priorities so those loads recover first in the event o...

Страница 13: ...d priority time elapses each contactor will CLOSE and LED will illuminate and stay ON 7 Once LED stays ON press TEST button and verify load shed occurs 8 Once load shed occurs LED will flash at one se...

Страница 14: ...ator while attempting recovery from a shed It is in a 30 minute lockout wait period Wait 30 minutes from lockout for unit to attempt to re apply load Review all loads enabled in household The generato...

Страница 15: ......

Страница 16: ...c All rights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45...

Отзывы: