Rev. 00 04/19
OptiCenter OC06
Operation
57
Operation
Operation
During the initial commissioning of the device, the functional
check is to be performed without powder!
Starting the OptiCenter
1.
Turn the main switch to the
ON position
.
– The control starts the operating system, the PLC control and the
operating software to the main page.
Fig. 54: Main page (not logged in)
2.
Press the symbol in the login status bar
to log in with a user
name and password
Содержание OptiCenter OC06
Страница 10: ...Rev 00 04 19 10 About these instructions OptiCenter OC06 ...
Страница 90: ...Rev 00 04 19 90 Maintenance Repairs OptiCenter OC06 ...
Страница 98: ...Rev 00 04 19 98 Decommissioning Storage OptiCenter OC06 ...
Страница 124: ......
Страница 126: ...Rev 00 ...