V12/19
20
•
Mechanical Installation
iONstream 4.0
For reels, the neutralizing bar should be installed so that it neutralizes the
roll after the last separating point (contact roller) (see
Fig. 3
) and is not
near metal objects on the sides of the bar.
fig. 3
*
Dimensions in this image are based on experience and may differ
from case to case. Adequate ionization efficiency must be
demonstrated for the particular application by measurement.
Blue is an alternative position for the reel but only for the rotary
direction shown.
Start of new roll
End of roll
iONstream
6 kV: to 600 mm*
12 kV: to 1500 mm*
18 kV: to 2000 mm*