Initial commissioning
Safety instructions for initial commissioning
2018-9015-005
09-2016
6
Initial commissioning
6.1
Special personnel qualification required for initial commissioning
Initial commissioning must be performed by trained personnel in accordance
with the safety instructions.
Read the section Safety - Personnel qualifications.
6.2
Safety instructions for initial commissioning
Warning!
Do not start this product until the initial commissioning checklist is
completed.
The first start steps intend to test the product in order to validate its functionality
and efficiency before handing it over to the customer. Therefore, the dealer
along with the customer must operate the product as well as the operating
elements.