D
IRECTION
5813707-100, R
EVISION
2
V
ENUE
™ S
ERVICE
M
ANUAL
8-30
Chapter 8 - Replacement Procedures
P R E L I M I N A R Y
8-2-10-5
C-FEB Installation Procedure
1.) Connect the metal bracket to the board
2.) Install the C-FEB so that the docking connector goes inside the docking bracket on the Front
Display assembly.
3.) Secure the 10 holding screws.
4.) Route the Front Display Indicator Cable.
5.) Install the C-BEB.
6) Install the fan.
7.) Install the C-PSB.
8.) Install back cover.
Figure 8-107 Removed C-FEB
•
•
•
•
Содержание Venue Go
Страница 13: ...DIRECTION 5813707 100 REVISION 2 VENUE SERVICE MANUAL Table of Contents 13 P R E L I M I N A R Y...
Страница 14: ...DIRECTION 5813707 100 REVISION 2 VENUE SERVICE MANUAL 14 Table of Contents P R E L I M I N A R Y...
Страница 131: ...DIRECTION 5813707 100 REVISION 2 VENUE GO SERVICE MANUAL Chapter 3 System Setup 3 57 P R E L I M I N A R Y...
Страница 132: ...DIRECTION 5813707 100 REVISION 2 VENUE GO SERVICE MANUAL 3 58 Chapter 3 System Setup P R E L I M I N A R Y...
Страница 133: ...DIRECTION 5813707 100 REVISION 2 VENUE GO SERVICE MANUAL Chapter 3 System Setup 3 59 P R E L I M I N A R Y...
Страница 134: ...DIRECTION 5813707 100 REVISION 2 VENUE GO SERVICE MANUAL 3 60 Chapter 3 System Setup P R E L I M I N A R Y...
Страница 135: ...DIRECTION 5813707 100 REVISION 2 VENUE GO SERVICE MANUAL Chapter 3 System Setup 3 61 P R E L I M I N A R Y...
Страница 136: ...DIRECTION 5813707 100 REVISION 2 VENUE GO SERVICE MANUAL 3 62 Chapter 3 System Setup P R E L I M I N A R Y...
Страница 137: ...DIRECTION 5813707 100 REVISION 2 VENUE GO SERVICE MANUAL Chapter 3 System Setup 3 63 P R E L I M I N A R Y...
Страница 138: ...DIRECTION 5813707 100 REVISION 2 VENUE GO SERVICE MANUAL 3 64 Chapter 3 System Setup P R E L I M I N A R Y...
Страница 323: ......