Installation
1-7
March 2004
Installing the
Transducers on the Pipe
Note:
Some pipe preparation may be required before securing the
transducers to the pipe. Remove any paint or coating from the
surface in contact with the transducers. A flat, smooth surface
is ideal.
1.
Apply the supplied couplant to the transducer faces, as shown in
Figure 1-3 below.
Figure 1-3: The Transducer Faces
2.
Put the transducer fixture at the desired location on the pipe.
Secure it with the supplied stainless steel clamps. Figure 1-4
below illustrates a typical installation.
Note:
Installation on the sides (at 3 and 9 o’clock) of the pipe is
ideal. The top of the pipe might contain bubbles, while the
bottom might contain sediment.
Figure 1-4: A Typical Transducer Installation
Once on the pipe, an internal spring mechanism ensures proper
mechanical pressure by “pressing” the transducer face against the
pipe surface. Refer to the next page to wire the transducer cables to
the UTX878.
Содержание UTX878 Ultrasonic
Страница 1: ...March 2004 Process Control Instruments UTX878 Ultrasonic Flow Transmitter User s Manual 910 253A ...
Страница 2: ...iii March 2004 The UTX878 Flow Transmitter and Transducers ...
Страница 8: ...Chapter 1 ...
Страница 20: ...March 2004 Installation 1 11 Figure 1 5 UTX878 Outline and Installation Dwg 712 1196 rev 2 ...
Страница 21: ...March 2004 Installation 1 12 Figure 1 6 Clamping Fixture Outline and Installation Dwg 570 076 rev 1 ...
Страница 22: ...March 2004 Installation 1 13 Figure 1 7 UTX878 Wiring Diagram Dwg 702 528 rev 2 ...
Страница 23: ...Chapter 2 ...
Страница 45: ...Chapter 3 ...
Страница 52: ...Chapter 4 ...
Страница 60: ...Chapter 5 ...
Страница 65: ...Chapter 6 ...
Страница 75: ...Chapter 7 ...
Страница 80: ...Appendix A ...
Страница 85: ...Appendix B ...
Страница 86: ...CE Mark Compliance Introduction B 1 EMC Compliance B 1 ...
Страница 88: ...Appendix C ...
Страница 89: ...Data Records Site Data C 1 ...
Страница 93: ...Appendix D ...
Страница 94: ...Service Record Introduction D 1 Data Entry D 1 Diagnostic Parameters D 3 ...
Страница 96: ...March 2004 D 2 Service Record Table D 1 Service Record cont Date Description of Service Performed By ...