Programming Site Data
2-15
March 2004
Entering Path Data
In the
Path
submenu, you can specify and check the path taken by the
transducer signal. Remember to record all programmed data in
Appendix C,
Data Records.
Note:
If you are in the PROG menu, proceed directly to Step 4. If
you scroll to a different option, press [ENT] twice to select
that option (once to enter and again to confirm the selection).
To access the
Path
submenu:
1.
Press [ESC]. The UTX878 enters the User Program.
2.
Press the [
X
] key until
PROG
is bracketed and press [ENT].
3.
Use the [
S
] and [
T
] keys to scroll to the desired
Channel
and
press [ENT].
4.
Scroll to the
Path
submenu and press [ENT].
5.
The meter first asks for the number of
Traverses
, or times the
signal crosses the pipe. Press [ENT], scroll to the number of
traverses for your installation, and press [ENT] to confirm the
entry.
Note:
The great majority of UTX applications call for two traverses.
Figure 2-5 below illustrates signal paths for a typical two-
traverse installation.
Figure 2-5: Signal Paths for a Two-Traverse Installation
6.
The remaining prompt displays the
Transducer Spacing
, as
calculated from the information entered. Use this number to set
the spacing of the transducers. (The minimum spacing is 0.9 in.)
If necessary, you can overwrite the spacing to match the actual
physical spacing of the transducers. Press [ENT] to open the
Spacing window, and use the arrow keys to change the value.
Then press [ENT] to confirm the value.
IMPORTANT:
It is recommended that you do not use a spacing
other than the one calculated by the UTX878.
However, if you do use a different spacing, do not
change the spacing by more than ±10% from that
calculated by the UTX878
.
Press [ESC] until you return to the
PROG
menu, or continue pressing
[ESC] until the display screen reappears.
Содержание UTX878 Ultrasonic
Страница 1: ...March 2004 Process Control Instruments UTX878 Ultrasonic Flow Transmitter User s Manual 910 253A ...
Страница 2: ...iii March 2004 The UTX878 Flow Transmitter and Transducers ...
Страница 8: ...Chapter 1 ...
Страница 20: ...March 2004 Installation 1 11 Figure 1 5 UTX878 Outline and Installation Dwg 712 1196 rev 2 ...
Страница 21: ...March 2004 Installation 1 12 Figure 1 6 Clamping Fixture Outline and Installation Dwg 570 076 rev 1 ...
Страница 22: ...March 2004 Installation 1 13 Figure 1 7 UTX878 Wiring Diagram Dwg 702 528 rev 2 ...
Страница 23: ...Chapter 2 ...
Страница 45: ...Chapter 3 ...
Страница 52: ...Chapter 4 ...
Страница 60: ...Chapter 5 ...
Страница 65: ...Chapter 6 ...
Страница 75: ...Chapter 7 ...
Страница 80: ...Appendix A ...
Страница 85: ...Appendix B ...
Страница 86: ...CE Mark Compliance Introduction B 1 EMC Compliance B 1 ...
Страница 88: ...Appendix C ...
Страница 89: ...Data Records Site Data C 1 ...
Страница 93: ...Appendix D ...
Страница 94: ...Service Record Introduction D 1 Data Entry D 1 Diagnostic Parameters D 3 ...
Страница 96: ...March 2004 D 2 Service Record Table D 1 Service Record cont Date Description of Service Performed By ...