Unpacking and Handling
Although the ASLP11 is carefully packaged to protect it against the rigors of
shipping, it is still possible that shipping damages can occur. Careful inspection
of the shipping carton should reveal some information about how the package
was handled by the shipping service. If evidence of damage or rough handling
is found, you should notify the shipping service and GE Intelligent Platforms as
soon as possible.
Sample packaging
Retain all packing material in case of future need.
Only after ensuring that both you and the surrounding area are protected from
ESD, carefully remove the ASLP11 from the shipping carton by grasping it by
the front panel. Place the board, in its antistatic bag, flat down on a suitable
surface. You may then remove the board from the antistatic bag by tearing the
ESD warning labels.
Proper handling of the ASLP11 is critical to ensure proper operation and long-
term reliability. When unpacking the board, and whenever handling it
thereafter, be sure to hold the board by the front panel. Do not hold the board
by the circuit card edges, the heat sink, or the connectors.
GE Intelligent Platforms – ASLP11 Hardware Reference Manual, Third Edition
Page 24
Содержание TELUM ASLP11
Страница 10: ......
Страница 19: ...Figure 2 Block diagram GE Intelligent Platforms ASLP11 Hardware Reference Manual Third Edition Page 19...
Страница 22: ......
Страница 26: ......
Страница 30: ......
Страница 52: ...GE Intelligent Platforms ASLP11 Hardware Reference Manual Third Edition Page 52...
Страница 60: ......
Страница 63: ...GE Intelligent Platforms ASLP11 Hardware Reference Manual Third Edition Page 63...