6.9
Startup Checks
All control system panels have cables pre-installed and factory-tested before shipment. However, final checks should be made
after installation and before starting the equipment.
Warning
This equipment contains a potential hazard of electrical shock or burn. Power is
provided by the control system to various input and output devices. External sources
of power may be present in the control system that are NOT switched by the control
power circuit breaker(s). Before handling or connecting any conductors to the
equipment, use proper safety precautions to ensure all power is turned off.
Inspect the cabinet components for any damage possibly occurring during shipping. Check for loose cables, wires,
connections, or loose components, such as relays or retainer clips. Report all damage that occurred during shipping to GE
Product Service.
Attention
Deposits containing ionic contaminants such as salt are difficult to remove completely,
and may combine with moisture to cause irreparable damage to the boards.
Installation Guidelines
GEH-6721_Vol_I_BP System Guide 153
Public Information
Содержание Mark VIe
Страница 61: ...Example UCSx Controller Label Control System Overview GEH 6721_Vol_I_BP System Guide 61 Public Information ...
Страница 66: ...Notes 66 GEH 6721_Vol_I_BP GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 74: ...Notes 74 GEH 6721_Vol_I_BP GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 116: ...Notes 116 GEH 6721_Vol_I_BP GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 164: ...Notes 164 GEH 6721_Vol_I_BP GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 198: ...Notes 198 GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 201: ......
Страница 202: ...Public Information ...