6.2
Equipment Receiving and Handling
GE inspects and packs all equipment before shipping it from the factory. A packing list, itemizing the contents of each
package, is attached to the side of each case.
Warning
Only personnel who are adequately trained and thoroughly familiar with the
equipment and instructions should install, operate, or maintain the equipment. To
prevent damage to the equipment, personnel injury, or death, safe equipment lifting
practices must be followed. For example, use adequate tie-off, load-spreading
mechanisms, precise lifting control, managed acceleration, the correct forklift/crane
rated for equipment tonnage, and so forth.
Upon receipt, carefully examine the contents of each shipment and check them with the packing list. Immediately report any
shortage, damage, or visual indication of rough handling to the carrier. Then notify both the transportation company and GE.
Be sure to include the serial number, part (model) number, GE requisition number, and case number when identifying the
missing or damaged part.
Attention
Immediately upon receiving the system, place it under adequate cover to protect it
from adverse conditions. Packing cases are not suitable for outdoor or unprotected
storage. Shock caused by rough handling can damage electrical equipment. To prevent
such damage when moving the equipment, observe normal precautions along with all
handling instructions printed on the case.
If technical assistance is required beyond the instructions provided in the documentation, contact the nearest GE Sales or
Service Office or an authorized GE Sales Representative.
Warning
Junction boxes can weigh well over 45.36 Kg (100 lb). Installation should be planned
to protect both the box and the personnel. The use of an overhead crane may be
required. Consult the site specific shipping and junction box documents. Follow all
standard safety practices.
Only personnel who are adequately trained and thoroughly familiar with the
equipment and the instructions should install, operate, or maintain this equipment.
130
GEH-6721_Vol_I_BP
GEH-6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I
Public Information
Содержание Mark VIe
Страница 61: ...Example UCSx Controller Label Control System Overview GEH 6721_Vol_I_BP System Guide 61 Public Information ...
Страница 66: ...Notes 66 GEH 6721_Vol_I_BP GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 74: ...Notes 74 GEH 6721_Vol_I_BP GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 116: ...Notes 116 GEH 6721_Vol_I_BP GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 164: ...Notes 164 GEH 6721_Vol_I_BP GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 198: ...Notes 198 GEH 6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I Public Information ...
Страница 201: ......
Страница 202: ...Public Information ...