GE
D
IRECTION
5273008-100, R
EVISION
9
LOGIQ C S
ERIES
B
ASIC
S
ERVICE
M
ANUAL
10-22
Section 10-5 - When There's Too Much Leakage Current...
ELECTRICAL SAFETY
Final Check. All system covers are in place. System scans with all probes as expected.
Accepted by: ______________________________________________________________________
Electrical Test Performed
Max Value
Allowed
Value
Measured
OK?
Comments
Outlet (correct ground &wiring config.)
System Ground Continuity
Chassis Source Leakage Current - Probe
Chassis Source Leakage Current - Caster
Chassis Source Leakage Current - CRT
Patient Lead Source Leakage
(Lead to Ground)
Patient Lead Source Leakage
(Lead to Lead)
Patient Lead Source Leakage
(Isolation)
Peripheral 1 Leakage Current
Peripheral 1Ground Continuity
Peripheral 2 Leakage Current
Peripheral 2Ground Continuity
Peripheral 3 Leakage Current
Peripheral 3Ground Continuity
PROBES
Probe Number
(from previous page)
Max Value
Allowed
Max Value
Measured
OK?
Comments
Probe 1:
Probe 2:
Probe 3:
Probe 4:
Probe 5:
Probe 6:
Probe 7:
Probe 8:
Probe 9:
Содержание LOGIQ C Series
Страница 1: ...GE LOGIQ C Series Basic Service Manual Part Number 5273008 100 Revision 9...
Страница 2: ......
Страница 11: ...GE DIRECTION 5273008 100 REVISION 9 LOGIQ C SERIES BASIC SERVICE MANUAL ix ZH CN KO...
Страница 163: ......