background image

GE H

EALTHCARE

 

 

D

IRECTION

 5305880-100, R

EVISION

 3 

LOGIQ™ 100 PRO S

ERVICE

 M

ANUAL

 - 

Page  5-15

State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process. 

See the GEHC Myworkshop System to determine the status of this document.

Approved Document - 5305880-100TPH_r3.pdf Page 102 of 197

Содержание LOGIQ 100 PRO

Страница 1: ... Co All Rights Reserved St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage2of197 ...

Страница 2: ... Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage3of197 ...

Страница 3: ...ET COMPRIS LE NON RESPECT DE CET AVERTISSEMENT PEUT ENTRAÎNER CHEZ LE TECHNICIEN L OPÉRATEUR OU LE PATIENT DES BLESSURES DUES À DES DANGERS ÉLECTRIQUES MÉCANIQUES OU AUTRES DIESES KUNDENDIENST HANDBUCH EXISTIERT NUR IN ENGLISCHER SPRACHE FALLS EIN FREMDER KUNDENDIENST EINE ANDERE SPRACHE BENÖTIGT IST ES AUFGABE DES KUNDEN FÜR EINE ENTSPRECHENDE ÜBERSETZUNG ZU SORGEN VERSUCHEN SIE NICHT DAS GERÄT Z...

Страница 4: ...DE ASSISTÊNCIA TÉCNICA O NÃO CUMPRIMENTO DESTE AVISO PODE POR EM PERIGO A SEGURANÇA DO TÉCNICO OPERADOR OU PACIENTE DEVIDO A CHOQUES ELÉTRICOS MECÂNICOS OU OUTROS IL PRESENTE MANUALE DI MANUTENZIONE È DISPONIBILE SOLTANTO IN INGLESE SE UN ADDETTO ALLA MANUTENZIONE ESTERNO ALLA GEMS RICHIEDE IL MANUALE IN UNA LINGUA DIVERSA IL CLIENTE È TENUTO A PROVVEDERE DIRETTAMENTE ALLA TRADUZIONE SI PROCEDA AL...

Страница 5: ... u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage6of197 ...

Страница 6: ...ll electrical work on these products GE will use its own specially trained filed engineers All of GE s electrical work on these products will comply with the requirements of the applicable electrical codes The purchaser of GE equipment shall only utilize qualified personnel i e GE s field engineer s personnel of third party service companies with equivalent training or licensed electricians to per...

Страница 7: ...written notice TRADEMARKS All products and their name brands are trademarks of their respective holders COPYRIGHTS All Material Copyright 1997 2007 by General Electric Inc All Rights Reserved St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s...

Страница 8: ...u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage9of197 ...

Страница 9: ...3 August 4 2008 Changes incorporated on contact details and added additional information based on service teams requirements St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u ...

Страница 10: ...u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage11of197 ...

Страница 11: ...4 7 Lockout Tagout Requirements For USA Only 1 18 1 4 8 Classification 1 18 Section 1 5 EMC EMI and ESD 1 19 1 5 1 Electromagnetic Compatibility EMC 1 19 1 5 2 CE Compliance 1 19 1 5 3 EMC Performance 1 19 1 5 4 Notice Upon Installation of Product 1 19 1 5 5 General Notice 1 20 1 5 6 Countermeasures against EMC related Issues 1 20 1 5 7 Notice on Service 1 20 1 5 8 Electrostatic Discharge ESD Prev...

Страница 12: ...6 3 5 1 Transducer Connection 3 6 3 5 2 Installation of Optional Accessories 3 7 3 5 3 Installation of Two Probe Adapter LOGIQ a200 Probe Adapter Optional 3 9 3 5 4 Installation of LOGIQ 100 PRO with Global or Modular Trolley 3 11 3 5 5 Adjustment of Monitor Brightness Contrast 3 17 3 5 6 Adjustment of System Clock Date Hospital Name OB Version 3 17 Section 3 6 System Configuration 3 17 3 6 1 Syst...

Страница 13: ...ols 4 11 4 7 1 Probe Connectors Check 4 11 Section 5 1Overview 5 1 5 1 1 Purpose of Chapter 5 5 1 Section 5 2 General Information 5 2 Section 5 3 Block Diagram 5 3 5 3 1 DAVINCI Block Diagram 5 5 5 3 2 LOGIQ 100 PRO BLOCK DIAGRAM 5 6 5 3 3 PCB Nomenclature 5 7 Section 5 4 Wiring Diagrams 5 8 5 4 0 1 Power Distributor Power Supply Wiring Diagram 5 8 Cable Assembly Diagrams 10 Section 5 5 Functional...

Страница 14: ...n 8 4 FRONT PANEL MONITOR 8 10 8 4 1 Disassembly Assembly of Front Panel 8 10 8 4 2 Disassembly Assembly of Monitor 8 12 Section 8 5 PCBs 8 14 8 5 1 Disassembly Assembly of Davinci Board 8 14 8 5 2 Disassembly Assembly of FEB for LOGIQ 100 PRO 8 18 Section 8 6 Fan Assembly 8 20 8 6 1 Disassembly Assembly of Fan 8 20 Section 8 7 Power Supply Distributor PCB 8 21 8 7 1 Disassembly Assembly of Power ...

Страница 15: ... Checks 10 7 10 5 2 Functional Checks See Also Chapter 4 10 8 10 5 2 1System Checks 10 8 Peripheral Option Checks 9 10 5 3 Input Power 10 9 10 5 3 1Mains Cable Inspection 10 9 10 5 4 Cleaning 10 9 10 5 4 1General Cleaning 10 9 10 5 5 Physical Inspection 10 10 10 5 6 Probe Maintenance 10 10 10 5 6 1Probe Related Checks 10 10 10 5 6 2Basic Probe Care 10 10 Basic Probe Cleaning 11 Section 10 6 Electr...

Страница 16: ...10 19 Meter Procedure using Probe Adapter to measure Probe isolation Sink Current 21 Section 10 7 When There s Too Much Leakage Current 10 23 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f...

Страница 17: ...on Contains any pre installation requirements for the LOGIQ 100 PRO 3 Chapter 3 Installation Contains installation procedure with installation checklist 4 Chapter 4 Functional Checks Contains functional checks that must be performed as part of the installation or as required during servicing and periodic maintenance 5 Chapter 5 Theory Contains block diagrams and functional explanations of the elec...

Страница 18: ...Covered by this Manual 1 1 6 Purpose of Operator Manual s The Operator Manual s should be fully read and understood before operating the LOGIQ 100 PRO and also kept near the unit for quick reference Hcat Number Description Comments H41072LA H41072LB H41072LC H41072LD H41072LE H41072LF H41072LS LOGIQ 100 PRO 100V 230V Table 1 2 LOGIQ 100 PRO Models Covered in this Manual St a t e RELEASE Do c u m e...

Страница 19: ...the prevention of radio wave interference to be used in hospitals clinics and other institutions which are environmentally qualified The use of this equipment is an inappropriate environment may cause some electronic interference to radios and televisions around the eqiupment Proper handling of this equipment is required in order to avoid such trouble according to the operator and service manuals ...

Страница 20: ...rmation about an item or a procedure Information contained in a NOTE can often save you time or effort DANGER IS USED TO INDICATE THE PRESENCE OF A HAZARD THAT WILL CAUSE SEVERE PERSONAL INJURY OR DEATH IF THE INSTRUCTIONS ARE IGNORED WARNING IS USED TO INDICATE THE PRESENCE OF A HAZARD THAT CAN CAUSE SEVERE PERSONAL INJURY OR PROPERTY DAMAGE IF INSTRUCTIONS ARE IGNORED Caution is used to indicate...

Страница 21: ... icons make you aware of specific procedures that should be followed ELECTRICAL MECHANICAL RADIATION LASER HEAT PINCH Table 1 3 Standard Hazard Icons AVOID STATIC ELECTRICITY TAG AND LOCK OUT WEAR EYE PROTECTION Table 1 4 Standard Icons Indicating a Special Procedure to be Used LASER LIGHT St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a ...

Страница 22: ...indicates equipment having a floating applied part having a degree of protection suitable for direct cardiac contact ECG connector and surgical probes Device Listing Certification Labels Laboratory logo or labels denoting conformance with industry safety standards such as UL or IEC Rear of console CAUTION This unit weighs Special care must be used to avoid This precaution is intended to prevent in...

Страница 23: ...ystem adjacent to mains switch OFF Standby Indicates the power off standby position of the power switch CAUTION This Power Switch DOES NOT ISOLATE Mains Supply Adjacent to On Off Standby Switch Mains ON Indicates the power on position of the mains power switch ON Indicates the power on position of the power switch CAUTION This Power Switch DOES NOT ISOLATE Mains Supply Protective Earth Indicates t...

Страница 24: ...tration value Maximum concentration values for electronic information products as set by the People s Republic of China Electronic Industry Standard SJ T11364 2006 include the hazardous substances of lead mercury hexavalent chromium cadmium polybrominated biphenyl PBB and polybrominated diphenyl ether PBDE 10 indicates the number of years during which the hazardous substance s will not leak or mut...

Страница 25: ...the hazardous substances of lead mercury hexavalent chromium cadmium polybrominated biphenyl PBB and polybrominated diphenyl ether PDBE Rear Panel LABEL SYMBOL PURPOSE MEANING LOCATION Table 1 5 Product Icons St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o...

Страница 26: ... may come in to contact with live parts and can cause an electric shock This system contains no operator serviceable components To prevent shock do not re move any covers or panels Should problems or malfunctions occur unplug the power cord Only qualified Service personnel should service the system Accidentally coming in contact with the electrical circuits inside the housing could cause serious i...

Страница 27: ...tandards ULTRASOUND PROBES ARE HIGHLY SENSITIVE MEDICAL INSTRUMENTS THAT CAN EASILY BE DAMAGED BY IMPROPER HANDLING USE CARE WHEN HANDLING AND PROTECT FROM DAMAGE WHEN NOT IN USE DO NOT USE A DAMAGED OR DEFECTIVE PROBE FAILURE TO FOLLOW THESE PRECAUTIONS CAN RESULT IN SERIOUS INJURY AND EQUIPMENT DAMAGE NEVER USE A PROBE THAT HAS FALLEN TO THE FLOOR EVEN IF IT LOOKS OK IT MAY BE DAMAGED Always loc...

Страница 28: ...Lables GHOST Label St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage29of197 ...

Страница 29: ...2 Warning Lables St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage30of197 ...

Страница 30: ... Warning Labels St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage31of197 ...

Страница 31: ...4 Warning Labels St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage32of197 ...

Страница 32: ...tà del sistema Verwenden Sie folgende Geräte nicht in der Nähe der Anlage Funktelefon Funkempfänger mobiler Funksender funkgesteuertes Spielzeug usw Bei Gebrauch dieser Geräte arbeitet die Anlage evtl nicht entsprechend der veröffentlichten Angaben Belassen Sie diese Geräte in der Nähe der Anlage ausgeschaltet Do not use the following devices near this equipment Cellular phone radio transceiver mo...

Страница 33: ...6 Warning Lables St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage34of197 ...

Страница 34: ...ULATION 2 Type BF EQUIPMENT Type B EQUIPMENT with a F TYPE isolated applied part providing a degree of protection against electric shock to such a degree that the allowable PATIENT LEAKAGE CURRENT under SINGLE FAULT CONDITIONS is not exceeded when 1 1 times the highest rated MAINS VOLTAGE is applied between the APPLIED PART and earth DANGEROUS VOLTAGES CAPABLE OF CAUSING DEATH ARE PRESENT IN THIS ...

Страница 35: ... characteristically cause electromagnetic interference with other equipment ei ther through air or connecting cables The term EMC Electromagnetic Compatibility indicates capability of the equip ment which curbs electromagnetic influence from other equipment and at the same time does not affect other equip ment with similar electromagnetic radiation from itself This product is designed to fully com...

Страница 36: ...ic interference may be reduced by positioning other equipment far away from the system 2 Electromagnetic interference may be reduced by changing the relative location installation angle of the system and other equipment 3 Electromagnetic interference may be reduced by changing wiring locations of power signal cables of other equip ment 4 Electromagnetic influence may be reduced by altering the pat...

Страница 37: ...yourself via an arm wrist strap to the advised esd connection point located on the rear of the scanner to the right of the power connector 2 Follow general guide lined for handling of electrostatic sensitive equipment WARNING WIPRO GE HEALTHCARE INDIA WIPRO GE HEALTHCARE PVT LTD ULTRASOUND GROUP PLOT 4 KADUGODI INDUSTRIAL AREA SADARAMANGALA BANGALORE 560067 INDIA TEL 91 80 2845 2923 FAX 91 80 2845...

Страница 38: ...30 Ultrasound Tech Support JAPAN TEL 65 291 8528 81 426 48 2950 FAX 65 272 3997 FAX 81 426 482902 81 426482944 ASIA China India Korea SEA Ultrasound Tech Support CHINA Ultrasound Tech Support INDIA Ultrasound Tech Support KOREA Ultrasound Tech Support SEA 86 8008108188 91 1800114567 82 262013585 65 62773444 EUROPE GE Ultraschall Deutschland GmbH Co KG BeethovenstraBe 239 Postfach 11 05 60 D 42665 ...

Страница 39: ...ent installation is scheduled CONTENTS IN CHAPTER 2 Section 2 2 General Console Requirements 2 2 1 Console Environmental Requirements Section Description Page Number 2 1 Overview 2 1 2 2 General Console Requirements 2 1 Table 2 1 Contents in Chapter 2 Operating temperature 10 to 40 o C Storage temperature 10 to 60 o C Humidity 30 to 75 rH non condensing Table 2 2 Environmental Specifications for L...

Страница 40: ...reach of the unit without extension cords Other outlets adequate for the external peripherals medical and test equipment needed to support this unit must also be present within 1 m 3 2 ft of the unit Electrical installation must meet all current local state and national electrical codes 2 2 2 4 Unit Power Plug If the unit arrives without a power plug or with the wrong plug you must contact your GE...

Страница 41: ...the unit is installed Electrical and electronic equipment may produce EMI unintentionally as the result of a defect These sources include medical lasers scanners cauterizing guns computers monitors fans gel warmers microwave ovens light dimmers portable phones The presence of a broadcast station or broadcast van may also cause interference See Table 2 4 for EMI Prevention tips St a t e RELEASE Do ...

Страница 42: ...roken replace the gasket Do not turn on the unit until any loose metallic part is removed Do not place labels where RF gaskets touch metal Never place a label where RF gaskets meet the unit Otherwise the gap created will permit RF leakage Or if a label has been found in such a position move the label Use GE specified harnesses and peripherals The interconnect cables are grounded and require ferrit...

Страница 43: ...cedures Paragraph Initials Observe Warnings Section 3 1 3 Unpack LOGIQ 100 PRO Section 3 2 Assemble LOGIQ 100 PRO Section 3 4 Perform Functional Checks Chapter 4 3 Perform Electrical Safety Tests Chapter 10 6 Table 2 6 Checklist for Installation St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E C...

Страница 44: ...es St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage45of197 ...

Страница 45: ...ew site CONTENTS IN CHAPTER 3 3 1 2 Average Installation Time Table 3 1 Contents in Chapter 3 Section Description Page Number 3 1 Overview 3 1 3 2 Receiving and Unpacking the Equipment 3 3 3 3 Preparing for Installation 3 5 3 5 Completing the Installation 3 6 3 6 System Configuration 3 17 3 7 Paperwork 3 28 Description Average Installation Time Comments Unpacking the scanner 20 Minutes Scanner wo ...

Страница 46: ... 15A plug if the on board peripherals do not cause the unit to draw more than 14 0 amps Do not operate this unit unless all board covers and frame panels are securely in place System performance and cooling require this OPERATOR MANUAL S The User Manual s should be fully read and understood before operating the LOGIQ 100 PRO and kept near the unit for quick reference ACOUSTIC OUTPUT HAZARD Althoug...

Страница 47: ...e Manual Gel Bottle Power Cord and other accessories kept on either side of the equipment Refer Figure 3 3 5 Lift the system wrapped with stretch film out of the box along with the packaging buffers Refer Figure 3 2 6 Slide the packaging buffers out to free the system 7 Remove the stretch film which is wrapped around the system Refer Figure 3 2 Figure 3 1 Unpacking LOGIQ 100 PRO Straps Adhesive Ta...

Страница 48: ...llustration below for details Figure 3 2 Unpacking LOGIQ 100 PRO Packaging Buffe Stretch Film Packaging Buffers Carton Flaps Figure 3 3 Unpacking LOGIQ 100 PRO St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h...

Страница 49: ...n are on the bottom cover 3 4 1 Installation of the System 1 Locate remove and unpack the probes located in the separate container 2 Make sure that system power is OFF before connecting or disconnecting the probe 3 Secure the probe to the receptacle as follows Refer to Fig 3 4 a Ensure probe twist lock lever points towards the top of the probe connector a Install probe connector on the receptacle ...

Страница 50: ...er in the clockwise direction to lock it in place Twist the lever in anti clockwise direction to disconnect the transducer Note It is not necessary to turn OFF power to connect or disconnect a transducer 2 Connect the main power cable to a hospital grade power receptacle with the proper rated voltage Never use a three to two prong adapter this defeats the safety ground Figure 3 4 Assembling LOGIQ ...

Страница 51: ...e connector on the rear panel Refer Figure 3 5 2 Connect the VCR to a suitable power outlet Using the BNC to BNC cable connect the Video Out on the rear panel of LOGIQ 100 PRO to the Video IN of the VCR 3 Connect the Video Graphic Printer VGP to a suitable power outlet Using the BNC to BNC cable connect the Video Out on the rear panel of LOGIQ 100 PRO to the Video IN of the VGP Connect the shutter...

Страница 52: ...n of Accessories St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage53of197 ...

Страница 53: ...er Figure 3 6 Note The two probe port or LOGIQ α 200 Probe Adapter can be connected to or disconnected from the system at any time regardless of whether the system is powered ON or OFF Figure 3 6 Unpacking Two Probe Adapter or LOGIQ α200 Probe Adapter PU Foam Box Two Probe port or LOGIQa 200 Probe Adapter St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co...

Страница 54: ...00 Lock to the 3 o clock position to secure the Two Probe Port or LOGIQ a 200 Probe Adapter to the system 10 Carefully replace the probe holder to its place and press firmly till the projections at the bottom fit into the slots in the upper flange and the system Figure 3 7 Installing Two Probe Port or LOGIQ 200 Probe Adapter Probe Holder Two Probe port Two Probe Port Lock 12 o clock Two Probe Port...

Страница 55: ...r form which needs assembly at field 1 Unpack the global trolley packed in a wooden box by opening the top cover refer Figure 3 8 trolley which is inside the box is seen in the diagram Figure 3 8 Global Trolley Unpacking St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e...

Страница 56: ...cked in a box by opening the top cover refer Figure 3 8 Figure 3 9 Modular Trolley Unpacking St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880...

Страница 57: ...ntd Figure 3 10 Modular Trolley Assembly St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage58of197 ...

Страница 58: ... Trolley ensure that lock plate gets into the projection on the trolley Refer Figure 3 11 Figure 3 11 Installation of Trolley LockPlate DetailX LockPlate Console DetailX Trolley AdditionalDetails St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p ...

Страница 59: ... Refer Figure 3 12 Figure 3 12 Installation of LOGIQ 100 PRO with the Trolley Projection Belt with Lock Handle VGP VGPTray 2179596 Ensure that 2179596 2 isused to take care of fitment problemof VGP s ReferSV Note SNLA100 014 Allthe NewTrolleyseffective September 1 2000 issupplied with modified FRU 2179596 2 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e ...

Страница 60: ...e 3 13 Installation of LOGIQ 100 PRO with Global or Modular Trolley St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage61of197...

Страница 61: ...n be modified by using the CONTROL S 1 key if required Refer Section Control Keys of the User Manual for more details CAUTION Functional checks in Chapter 4 to be carried out before handing over the system to the customer Section 3 6 System Configuration 3 6 1 System Specifications 3 6 1 1 Physical Dimensions The physical dimensions of the LOGIQ 100 PRO unit are summarized in Table 3 2 Height Widt...

Страница 62: ... 14 Front View St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage63of197 ...

Страница 63: ...ed 420 6 16 5 405 15 9 Figure 3 16 Side View Keyboard Open 596 23 5 2 8 9 1 1 4 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pd...

Страница 64: ...100 PRO GEMS HCAT NUMBER Voltage Tolerance s Current Frequency H41072LA H41072LB H41072LC H41072LD H41072LE H41072LF H41072LS 100 230 VAC 10 0 9 1 8 A Max 50 60 Hz Table 3 5 Electrical Specifications for LOGIQ 100 PRO St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GE...

Страница 65: ...the LOGIQ 100 PRO system External Optional Peripherals VCR Sony SVO 9500MD VGP Sony UP 895MD MDW and UPD 897MDW Printing through Laser Jet Printer with HP LaserJet 1020 Plus Images can be transfered to memory stick from the image archive Table 3 6 Parameter Limits Voltage Range USA JAPAN Europe 100 115VAC 10 90 127VAC 200 240VAC 10 198 264VAC Power USA JAPAN Europe MAX 145VA MAX 175VA Line Frequen...

Страница 66: ...onnector control connections for Video Graphic Printer and USB Port for the LOGIQ 100 PRO The Thumb Drive Memory Stick Model TS512MJF150 HP Laser Jet printer HP1020 Sony VGP Printer Model UP D897MD UP 897MD can be connected through the USB slot provided in the rear panel Figure 3 17 Optional Peripherals St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n...

Страница 67: ...ation of the Foot switch 1 Switch ON the LOGIQ 100 PRO unit 2 Connect the footswitch cable to the Footswitch slot provided in the rear panel 3 Press foot switch to check its functionality 4 By pressing the foot switch pedal the image in the screen should freeze Pin No Signal 1 Foot Switch 2 GND 3 GND 4 GND 5 GND Figure 3 19 Foot Switch Connector Round 5 pin connector St a t e RELEASE Do c u m e n ...

Страница 68: ...view the stored images 6 Press Record button on the keyboard and check if the selected image matches with the VGP print out 3 6 4 3 Pin Assignment of Mini Jack controlling VGP 3 6 4 4 Video Casette Recorder Connect the VCR Sony SVO 9500MD H4120SR for NTSC and Sony SVO 9500MDP E11801AA for PAL System to the Video IN socket in the rear panel Press the EXT VIDEO button on the keyboard to enable an ex...

Страница 69: ...ake paper printout of the images and report pages The LOGIQ 100 PRO supports printing in A4 size papers in the HP laser Jet 1020Series with standard USB cable Figure 3 23 Printer connection to Rear panel Installation of Laser Jet Printer 1 Switch ON on the LOGIQ 100 PRO unit 2 Connect the USB cable from the printer to the USB port provided in the rear panel of LOGIQ 100 PRO unit 3 To Print images ...

Страница 70: ... Memory stick move the trackball to the images that you want to transfer and press 3 To transfer all images available in the archive press 2 to select images and 3 to transfer images to Memory stick Please ensure that the USB Memory stick has to be connected before attempting to transfer images to USB Memory stick If USB is not connected to the LOGIQ 100 PRO system the system will prompt USB not c...

Страница 71: ...e Type Part No Catalog No Freq in MHz C36 2268634 H41252CF 3 5 C55 2107925 H45252CE 5 0 E72 2274908 H41252ME 6 5 L76 2274906 H41252HP 7 5 C31 2175994 H45252CS 3 5 CZB 2152422 H45202CZ 6 5 LB P9601AQ H46022LB 3 5 Table 3 8 Available Probes St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o ...

Страница 72: ... 472 Horizontal Timing Video Amplitude SL Parameter NTSC PAL 1 Total H Line Time 63 556 micro sec 64 00 micro sec 2 H Sync Pulse Width 4 725 micro sec 4 68 micro sec 3 Back Porch 4 725 micro sec 4 68 micro sec 4 Total Active H line time 52 64 micro sec 52 07 micro sec 5 Front Porch 1 46 micro sec 1 49 micro sec 6 Video Amplitude back porch to peak 0 7Vpp 0 7Vpp 7 Sync Amplitude back porch to peak ...

Страница 73: ...stallation Card Product Locator to the address corresponding to your pole Note The Product Locator Installation Card shown in Figure 3 25 may not be same as the Product Locator card actually provided Figure 3 25 Product Locator Card St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s ...

Страница 74: ...LEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage75of197 ...

Страница 75: ... Operator s Manual CONTENTS IN CHAPTER 4 Section Description Page Number 4 1 Overview 4 1 4 2 General Procedures 4 2 4 3 Functional Check Procedures 4 4 4 4 Diagnostics 4 9 4 5 Software Configuration Checks 4 10 4 6 Peripheral Checks 4 10 4 7 Patient contact tools 4 11 Table 4 1 Contents in chapter 4 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t ...

Страница 76: ...his is a description on how to Shut Down Power UP the system 4 2 1 2 Lockout Tagout Requirements For USA Europe Follow OSHA Lockout Tagout requirements by ensuring you are in total control of the plug 4 2 1 3 Power Up 1 Connect the Power Cable at the rear of the System 2 Connect the Power cable to an appropriate mains power outlet Figure 4 1 Mains Circuit Breaker and Mains Power Cable Mains Power ...

Страница 77: ... code is distributed to initiate the scanner Power Up Display Comes Up Refer figure 4 3 4 2 1 5 Power Shutdown 1 Switch OFF the ON OFF at the Front of the system 2 Disconnect the Mains Power Cable if needed Figure 4 2 ON OFF key on Front Panel St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO ...

Страница 78: ...Mode Image appears 2 Gray Scale Display 3 Horizontal Scale Marker 4 Vertical Scale Marker 5 Hospital Name If previously entered 6 Date 7 Time 8 Probe Type 9 Focus Marker on vertical scale 10 Depth 150mm 11 Gain G54 12 Dynamic Range D54 13 Frequency Points 10 12 form a continuous code in the lower left hand corner of the monitor and they are factory default values Only for C36 Probe St a t e RELEAS...

Страница 79: ...Power Up Monitor Display Convex Probe St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage80of197 ...

Страница 80: ...p Press M key Roll Trackball Press M key a second time B M Mode with M line cursor appears Use trackball to move the M line cursor Refer Figure 4 4 The M Line cursor should follow the trackball movement and the real time image varies on the M Mode display Only M Mode image appears on the screen Press B Mode Key to exit M Mode Press Freeze key The image will freeze Press ATO ATO Automatic Tissue Op...

Страница 81: ...torage Freeze the image Press Store Press Recall Comment column appears at the bottom of the display Enter the comment in that and press Store again to Store the image Image Archive screen appears with option menu at the bottom Select the image using the trackball Use Dynamic Range to page up down in the Image Archive screen Press 1 to View the selected image Press 2 to Clear the selected image Pr...

Страница 82: ... Mode Display St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage83of197 ...

Страница 83: ...LED glows when the cursor is moved in the B M mode FEB LED Location on FEB D66 This LED indicates the probe connect signal is good This indicates the FEB is Good FEB LED Location on FEB D67 This LED indicates the B mode signal is given to the display The intensity of this LED is more during B mode FEB LED Location on FEB D68 This LED indicates the M mode signal is given to the display This LED glo...

Страница 84: ...he screen is printed on B W Video Graphic Printer 3 Press SHIFT RECORD Key on the Control Panel To image or report page displayed on the screen is printed on the Laser Jet Printer connected to the USB Port of the System 4 Press SHIFT RECORD Key on the Control Panel To print the displayed image on the screen to the USB B W Video Graphic Printer 5 Press EXTERNAL VIDEO Key on the Control Panel Enable...

Страница 85: ...ted to the unit should be stored in their storage case 4 To test the Two Probe Adapter Connect it to the System To connect to the probe port 5 Hold the Two Probe Port connector horizontally Turn the connector locking handle to the Vertical position Align the connector with the probe port and carefully push into place Rotate the locking handle to the full Horizontal position to lock in place To con...

Страница 86: ... into place Rotate the locking handle to the full Horizontal position to lock in place Position the probe cable so that it is not resting on the floor CAUTION Do not allow the probe head to hang freely Impact to the probe head may result in irreparable damage It will display the Probe name on the Screen Step Check Expected Result s If Not Remedy Table 4 5 Probe and connectors check St a t e RELEAS...

Страница 87: ... 5 1 Overview 5 1 5 2 General Information 5 2 5 3 Block Diagram 5 3 5 4 Wiring Diagrams 5 8 5 5 Functional Subsystems 5 12 5 6 Video Specifications 5 14 5 7 Rear Panel Signal List 5 14 Table 4 6 Contents in Chapter 5 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEH...

Страница 88: ...nnector to the Front End then to the Mid Processors and Da Vinci CPU and finally to the monitor and peripherals System configuration is stored on EPROM and all necessary software is loaded when powered up Figure 4 5 LOGIQ 100 PRO Major Components 1 2 3 4 5 6 7 1 Probe Holder 2 Gel Bottle Holder 3 Brightness Contrast 4 Handle 5 Monitor 6 Keyboard 7 Probe connector 8 Power Switch 8 St a t e RELEASE ...

Страница 89: ...oard BUS ECO Signal COMPOSITE Signal VGA Signal USB Signal TRANSMIT Signal RECIEVE Signal DIP 1 DIP 2 MODE 1 0 Normal mode 0 1 Service mode Table 4 7 DIP 3 MODE 0 NTSC 1 PAL Table 4 8 NTSC PAL settings St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s ...

Страница 90: ... of FEB LOGIQ 100 PRO St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage91of197 ...

Страница 91: ...oard LOGIQ 100 PRO St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage92of197 ...

Страница 92: ...IAGRAM St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage93of197 ...

Страница 93: ...Front End Board For LOGIQ 100 PRO All S W Versions PDB Power Distributor PCB For LOGIQ 100 PRO All S W Versions HVPS High Voltage Power Supply For LOGIQ 100 PRO All S W Versions Table 4 9 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e...

Страница 94: ... 4 9 Power Distributor Power Supply Wiring Diagram for LOGIQ 100 PRO St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage95of19...

Страница 95: ... Gnd Pin 5 Gnd Pin 5 Gnd Pin 6 12V in Pin 6 Gnd Pin 6 12V Pin 7 12VD Pin 8 Gnd Pin 9 12VD Pin 10 Gnd Table 4 11 Power Distributor Input and Output Voltages of LOGIQ 100 PRO Location for Testing HV on FEB Specification FEB Test Point 90 65 Vdc 3Vdc FEB Test Point 91 80 Vdc 3 vdc FEB Test Point 62 65 and 73 12 Vdc 3 vdc FEB Test Point 63 67 and 70 5 V dc 3 vdc FEB Test Point 110 12V dc 3 vdc FEB Tes...

Страница 96: ...iring Diagram Davinci board TGC connector St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage97of197 ...

Страница 97: ...ch wires wound 2 Turns St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage98of197 ...

Страница 98: ...pports 16 channels Beamformer The beamformed data is passed through CHACOM ASIC and subsequently passed through Frame Averaging filter and Mean filter The Output of FEB is fed to the Davinci CPU PWA through a board to board connector This connector also provides power to the Davinci CPU PWA Board St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o ...

Страница 99: ...Ps2 standard GAIN Encoder GAIN_CCW and GAIN_CW pins of the gain encoder are connected to the GPIO pins of Davinci CPU 5 On Screen Display OSD Video Out and Monitor Display The DAVINCI CPU generates the OSD along with the image in NTSC or PAL video output format standard to the Video Out and Monitor connector 6 USB port interface The Davinci CPU PWA provides one USB 2 0 Host connector This port is ...

Страница 100: ...fications Refer to Section 3 6 5 for more details about the Video Specifications Section 5 7 Rear Panel Signal List Refer to Section 3 6 4 for more details about the rear panel signal list St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t ...

Страница 101: ... m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage102of197 ...

Страница 102: ...t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage103of197 ...

Страница 103: ...nstead of trying to adjust the potentiometer or replacing the fuse No Service Adjustments WARNING DO NOT ADJUST CRT POTENTIOMETERS WARNING Whenever Upgrade of LOGIQ 100 PRO is done at field Please ensure patient data back up is done before upgrading the machine St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t...

Страница 104: ...e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage105of197 ...

Страница 105: ...ools include test procedures for testing the system at PCB level as well as block level The diagnostic tools provides a pop up menu to enable selection of various tests to test various blocks on the system CONTENTS IN CHAPTER 7 Section Description Page Number 7 1 Overview 7 1 7 2 Power On Diagnostics 7 3 Service Diagnostics 7 3 7 2 1 Davinci Board Test 7 4 7 2 2 FEB Test for LOGIQ 100 PRO 7 7 7 2 ...

Страница 106: ...N during Acoustic Frame measurement switching This also indicates the communication between the DSP and the Davinci CPU FPGA DAVINCI LED Location on Davinci CPU D11 This LED indicates the Video Sync is happening This indicates the video frame output from the Davinci CPU to the monitor is ok DAVINCI LED Location on Davinci CPU D10 This LED indicates the KEY press on the keyboard It glows intermitta...

Страница 107: ...e diagnostics Service Diagnostics Check the S W Version of your System prior to start of the service diagnostics The S W version can be known during the power up Sequence Press CTRL S Enter keys on the keyboard to enter the service diagnostics In response a pop up menu appears as shown in Table 7 1 Note Option Q Quit can be used to come out of the diagnostic and enter the application mode Figure 7...

Страница 108: ...d is tested by filling the memory with test patterns and reading them back and validating the read data If any of the memory byte does not contain the expected data it is declared as faulty Graphics Memory Test The overlay or the graphics memory is tested in the same way as Read Write memory Debug Port Test Internal Loop Back Test In this test the port is programmed for internal loop back mode so ...

Страница 109: ...aphics Test Figure 7 4 FRAM TEST NAND FLASH MANUFACTURER ID 0x20 MANUFACTURER NAME ST Micro NUMBER OF BLOCKS 4096 NUMBER OF BAD BLOCKS 0 USABLE MEMORY IN BYTES 67108864 NOR FLASH MANUFACTURER ID 0x1 MANUFACTURER NAME AMD AM29LV256M CHECKSUM TEST PASSED PRESS ANY KEY TO QUIT TESTING NAND AND NOR FLASH St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t ...

Страница 110: ... all available flash image slots This status info is stored in the FRAM When we run this option The Davinci will check the Flash and update its status stored in FRAM Note This option must be run during the following instance without fail A Take a back up of the archive before the system is upgarded to a higher version of software Figure 7 5 FLASH MEMORY TESTS FLASH MEMORY TESTS 1 ALL TESTS 2 TEST ...

Страница 111: ... option is used to return to the main menu Quit This option is used to come out of the diagnostic mode and enter the application mode 7 2 2 FEB Test for LOGIQ 100 PRO When self test for the FEB is selected the DPRAM on the FEB Board will be written on and read back Read data is checked for validity This will prove the communication between FEB Davinci boards All Tests This option is used to run al...

Страница 112: ...roper display of the FEB Test pattern To exit from this mode press CLEAR on the keyboard St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100...

Страница 113: ...e displayed on the monitor The FREEZE and EXTERNAL VIDEO LEDs blink for a while sequentially and the corresponding field gets highlighted Trackball Test A cursor is displayed on the monitor and the user can move the trackball and move the cursor over the screen Gain Knob Test In this test the user can check for the operation of the gain knob The current gain value is displayed on the screen Main M...

Страница 114: ... 13 The Gain Knob is used for selection of patterns 1 10 To exit out of any pattern and return to the main menu press EXTERNAL VIDEO Figure 7 7 Monitor Test Figure 7 8 Monitor Test St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o ...

Страница 115: ...Test Figure 7 10 Monitor Test St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage116of197 ...

Страница 116: ...st Figure 7 12 Monitor Test St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage117of197 ...

Страница 117: ...m of 32 keys last activated The history of keys used is stored even after powered off Figure 7 13 Monitor Test Figure 7 14 Key Operation History KEY OPERATION HISTORY KEY OPERATED KEY OPERATED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 PRESS EXT_VIDEO TO QUIT St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n ...

Страница 118: ...comes up when shift record is pressed without connecting the printer Only for LOGIQ 100 PRO PRINTER ERROR This message comes up when an error occurs in the printing process PRINTING ABORTED This message is displayed during Printing due to printer error Only for LOGIQ 100 PRO WARNING THIS WILL ERASE ALL IMAGES 1 YES 2 NO This message is displayed when the 3 Clear ALL is pressed after going to the r...

Страница 119: ...Keyboard to Davinci interface cable may be defective Keyboard may be defective If the EXT Video LED and the FREZZE LED are glowing simultaneously during Boot Up then the keyboard may be defective Replace the same Replace the same Replace the same No System Mode Acknowledgement Error message Davinci interface may not be proper Replace FEB or Davinci pcb No Text Davinci may be defective Replace the ...

Страница 120: ... artefacts AC line interference Change the AC input Check for proper grounding Video In Video Out not working Connection on the rear panel not ok Davinci maybe defective Set right the same Replace the same Foot switch not working Connection on the rear panel not ok Davinci maybe defective Set right the same Replace the same Remote Control not working Rear panel or Davinci maybe defective Connectio...

Страница 121: ...oting St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage122of197 ...

Страница 122: ...RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage123of197 ...

Страница 123: ...rmittently St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage124of197 ...

Страница 124: ...Area St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage125of197 ...

Страница 125: ...etting updated St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage126of197 ...

Страница 126: ...iring St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage127of197 ...

Страница 127: ...s St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage128of197 ...

Страница 128: ...RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage129of197 ...

Страница 129: ... Disassembly Assembly of Davinci Board FRU 601 603 604 1433 8 14 8 5 2 Disassembly Assembly of FEB for LOGIQ 100 PRO FRU 703 8 18 8 6 Fan Assembly FRU 901 8 20 8 7 Power Supply Distributor PCB FRU 801 802 8 21 8 8 Rear Panel FRU 1001 8 21 8 9 HV Assembly FRU 1101 8 24 8 10 Chassis FRU 1201 8 25 Table 8 1 Contents in Chapter 8 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o ...

Страница 130: ...m of the unit 7 Remove the handle cap by pulling upward and remove the handle screws c d 8 Slide the top cover backward by holding the handle 9 For assembly follow the reverse order Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section 8 2 1 Equipment passed all required tests and is ready for use 4 2 1 Power OFF S...

Страница 131: ...p Cover 101 102 a b c d e f Handle Cap Probe Holder St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage132of197 ...

Страница 132: ...e lock release and turn the keyboard 90 Move the keyboard downward and carefully pull out the cable with the connector 7 Remove the 2 ring bushes refer Figure 8 2 8 For assembly follow the reverse order Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section 8 3 1 Equipment passed all required tests and is ready for ...

Страница 133: ...2 Detaching the Keyboard St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage134of197 ...

Страница 134: ...wo screws o p holding the Gain Encoder Unit 12 Remove eleven screws q x 11 Nos holding the keyboard PCB to the base plate to separate the keyboard PCB 13 For assembly follow the reverse order Note When assembling the PCB to the base plate M3x6 screws only should be used because a wrong screw used will pierce the key sheet Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 ...

Страница 135: ...7 302 308 q 11 Nos 305 309 a d c e l f g k o p n m j i h r s t u 306 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage136of1...

Страница 136: ...gure 8 4 7 For assembly the keyboard PCB follow the reverse order of Section 8 3 2 Note When assembling the PCB to the base plate M3x6 screws only should be used because a wrong screw used will pierce the key sheet 8 For initializing the Optical Trackball Select Alps Trackball from the Trackball Selection Menu in Service Diagnostics Figure 8 4 Optical Trackball Assembly z y x D A B C St a t e RELE...

Страница 137: ...gure 8 5 14 For assembly the keyboard PCB follow the reverse order of Section 8 3 2 Note When assembling the PCB to the base plate M3x6 screws only should be used because a wrong screw used will pierce the key sheet 15 For initializing the Optical Trackball Select Alps Trackball from the Trackball Selection Menu in Service Diagnostics Figure 8 5 Optical Trackball Assembly for LOGIQ 100 PRO C St a ...

Страница 138: ...along the rib 8 Remove two screws c d from the support plate on the chassis 9 Disconnect the connector coming from the POWER ON Switch 10 Slide the front panel and keyboard sub assembly together 11 For assembly follow the reverse order Table 8 5 Functional tests Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section...

Страница 139: ...ront Panel 402 401 a b e f c d Lock Hold 404 405 Power Switch 403 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage140of197 ...

Страница 140: ...assembly 9 For assembly follow the reverse order Note Ensure that the monitor switch all the four near Fly Back Transformer is set to PAL side in case of PAL systems and to NTSC side in case of NTSC systems Note If CRT fails replace along with PCB Table 8 6 Functional tests Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880...

Страница 141: ...bly of Monitor St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage142of197 ...

Страница 142: ...and detach the Davinci board separately from the flush connector on the FEB 6 For assembly follow the reverse order Table 8 7 Functional tests Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section 8 5 1 Equipment passed all required tests and is ready for use 4 2 1 Power OFF Shut down 4 3 Functional Checks 4 5 Soft...

Страница 143: ...isassembly Assembly of Davinci Board St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage144of197 ...

Страница 144: ... Davinci Board Disassembly St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage145of197 ...

Страница 145: ...ing for NTSC PAL Dip Switch St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage146of197 ...

Страница 146: ... on the Davinci board to mate the Davinci and the FEB 9 Remove the Davinci board from the FEB Flush type connector slowly 10 For assembly follow the reverse order Table 8 8 Functional tests Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section 8 5 2 Equipment passed all required tests and is ready for use 4 2 1 Pow...

Страница 147: ...ating connector Davinci FEB St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage148of197 ...

Страница 148: ... the reverse order Figure 8 12 Disassembly Assembly of Fan Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section 8 6 1 Equipment passed all required tests and is ready for use 4 2 1 Power OFF Shut down 4 3 Functional Checks Table 8 9 Functional tests St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e...

Страница 149: ...g the Power Supply to the chassis 9 Remove two screws i k and loose the other two screws j l and remove the dust filter plate 10 Slide the power supply forward CRT may have to be lifted up to remove the power supply 11 Remove six screws holding the Power Supply Distributor PCB to the power supply rear bracket not shown in figure 12 Remove the Power Distributor PCB upward after disconnecting the ca...

Страница 150: ... Davinci board FEB and CRT PCB Figure 8 13 Disassembly Assembly of Power Supply Distributor PCB Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section 8 7 1 Equipment passed all required tests and is ready for use 4 2 1 Power OFF Shut down 4 3 Functional Checks 4 5 Software configuration check 7 2 Diagnostics tests ...

Страница 151: ...ot up Service manual direction 5305880 100 Section 8 8 1 Equipment passed all required tests and is ready for use 4 2 1 Power OFF Shut down 4 3 Functional Checks 4 6 Peripheral checks Figure 8 14 Disassembly Assembly of Rear Panel St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s ...

Страница 152: ...e 8 12 Functional tests Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section 8 9 1 Equipment passed all required tests and is ready for use 4 2 1 Power OFF Shut down 4 3 Functional Checks Figure 8 15 Disassembly Assembly of HV Assembly St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l...

Страница 153: ... e f g h on the base 10 For assembly follow the reverse order Table 8 13 Functional tests Service Manual Section Functional Test Diagnostic Test Debrief Script 4 2 1 Power ON Boot up Service manual direction 5305880 100 Section 8 10 1 Equipment passed all required tests and is ready for use 4 2 1 Power OFF Shut down 4 3 Functional Checks 7 2 Diagnostics tests 4 5 Software Configuration checks 4 6 ...

Страница 154: ... c d e f g h 1201 1202 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage155of197 ...

Страница 155: ...9 1 6 MATERIAL LIST Monitor 9 8 9 1 7 MATERIAL LIST Davinci Board 9 9 9 1 8 MATERIAL LIST FEB 9 10 9 1 9 9 1 9 MATERIAL LIST Power Supply Distributor PCB 9 11 9 1 10 9 1 10 MATERIAL LIST Rear Panel 9 12 9 1 11 9 1 11 MATERIAL LIST HV Power Supply Assembly 9 13 9 1 12 9 1 12 MATERIAL LIST Cable Assembly 9 14 Table 9 1 Contents in chapter 9 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u...

Страница 156: ...le P9509BC 1 1 1 1 1 1 1 BNC Cable P9509BD 1 1 1 1 1 1 1 Foot Switch Option 2152089 2 1 1 1 1 1 1 1 H41062A Mobile Trolley option 2196004 1 1 1 1 1 1 1 H41052LA Modular Trolley Option 2240994 1 1 1 1 1 1 1 H41052LC Two Probe Port Option 2208220 1 1 1 1 1 1 1 H41072A E72 Probe Holder Option 2184039 1 1 1 1 1 1 1 H41042A HP Laser jet Printers Option 1020 only 5305335 1 1 1 1 1 1 1 HP Laser jet with ...

Страница 157: ...101 Table 9 1 Top Cover Item Part Name Part No Description Qty 101 Top Cover Assembly 5318780 LOGIQ 100 PRO 1 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t Approve...

Страница 158: ...me Part No Description Qty 201 Keyboard Assembly 5305699 LOGIQ 100 PRO 1 204 Keyboard assembly for L100 Pro_ Russia 5307742 LOGIQ 100 PRO 1 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t...

Страница 159: ...5304441 5304596 5306834 Figure 9 3 Keyboard Assy 303 304 305 309 310 311 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage16...

Страница 160: ...ble instruction Optical Trackball 1 309 TGC Assembly 5304587 LOGIQ 100 PRO 1 310 Cable Assy 22N 5268899 Davinci keyboard interface cable 1 311 Cable Assy 26N 5264931 TGC Davinci interface cable 1 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p ...

Страница 161: ...Panel 401 Table 9 4 Front Panel Item Part Name Part No Description Qty 401 Front Panel Assembly 2337067 LOGIQ 100 PRO 1 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n...

Страница 162: ...Item Part Name Part No Description Qty 501 Monitor Assembly CRT PCB with Cable Assy 15 PAL NTSC 2139789 3 LOGIQ 100 PRO 1 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e...

Страница 163: ...d for the required type Figure 9 6 Davinci Board 601 Table 9 6 Davinci Item Part Name Part No Description Qty 601 Davinci Assy PAL NTSC 5212995 LOGIQ 100 PRO 1 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h...

Страница 164: ... Part No Description Qty 703 FEB Assy 5199849 LOGIQ 100 PRO 1 704 FEB DAVINCI Assy 5308177 LOGIQ 100 PRO 1 Davinci board FEB 704 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o ...

Страница 165: ...Figure 9 8 Power Supply Distributor PCB 801 802 Table 9 8 Power Supply Distibutor PCB Item Part Name Part No Description Qty 801 Condor power supply assembly 5310660 LOGIQ 100 PRO 1 802 Power Distributor Assembly 5198818 LOGIQ 100 PRO 1 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c ...

Страница 166: ...l Assy Item Part Name Part No Description Qty 901 Rear panel Assembly 5305191 LOGIQ 100 PRO 1 902 FAN Assembly 2139798 LOGIQ 100 PRO 1 902 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t ...

Страница 167: ...mbly 1001 Table 9 10 HV Power Supply Assembly Item Part Name Part No Description Qty 1001 HV Power Supply Assembly 2300757 LOGIQ 100 PRO 1 St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t ...

Страница 168: ...le Core Support Clamp and associated Screws and Nuts USB Cable Assy 5269617 1 Davinci Rear Panel USB Port cable for LOGIQ 100 PRO Cable Assy 28N 5267859 1 Power Distributor PDB to FEB Cable Assy 29N 5265017 1 Power Supply to Power Distributor PDB Cable Assy 30N 5273256 1 FEB to HV Power Supply Table 9 3 Cable Set for LOGIQ 100 PRO Probe Type Part No Catalog No C36 2268634 H41252CF C55 2107925 H452...

Страница 169: ... e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage170of197 ...

Страница 170: ...EASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage171of197 ...

Страница 171: ...ge Current 10 23 PM Inspection Certificate 10 29 Table 10 1 Contents in Chapter 10 Practice good ESD prevention Wear an anti static strap when handling electronic parts and even when disconnecting connecting cables THERE ARE SEVERAL PLACES ON THE REAR PANEL THAT ARE DANGEROUS BE SURE TO DISCONNECT THE SYSTEM POWER PLUG AND OPEN THE MAIN CIRCUIT BREAKER BEFORE YOU REMOVE ANY PARTS BE CAUTIOUS WHENE...

Страница 172: ...umented and maintained on the site Your GE service representative can help you with establishing performing and maintaining records for a quality assurance program Section 10 3 Periodic Maintenance Schedule 10 3 1 How often should PMs be performed The Periodic Maintenance Schedule specifies how often your LOGIQ 100 PRO should be serviced and what items need attention It is the customer s responsib...

Страница 173: ...cks also after corrective maintenance or as required by your facilities QA program Endocavity Probe Leakage Current Checks Twice Annually Transesphongeal Probe Leakage Current Checks As Prescribed in probe manual Surgical Probe Leakage Current Checks As Prescribed in probe manual Measurement Accuracy Checks also after corrective maintenance or as required by your facilities QA program Probe Phanto...

Страница 174: ...41594 Screwdriver Blade 1 8 in x 4 in 9 9487 Utility Knife 9 41581 Screwdriver Blade 3 16 in x 4 in 9 45341 Pliers Vice Grip 10 inch 9 39451 20 Steel Tape locking Spring load 9 3001 Xacto Pen Knife 9 GH807 Ratchet Offset Slotted 9 HT62002 Solder Aid Fork and Hook 68 412 Ratchet Offset Phillips 9 4099 Mirror Round Telescoping 9 GH130 Tapered Reamer 9 GH3001 Steel Rule Decimal 6 inch 9 41584 Screwdr...

Страница 175: ... of GE 1 Tool Kit Contents Continued GE 2 Sears Kit 99034 Tool ID Description Tool ID Description 9 45381 Pliers Arc Joint 9 1 2 inch 9 44067 Socket 1 1 16 in for 1 2 in drive 9 45092 Pliers Linesman 8 1 2 inch 9 42679 Socket 10MM Hex for 1 2 in drive 2273333 9 42882 Punch Pin 3 32 inch 9 44262 Extension 10 inch for 1 2 in drive 2273405 9 42884 Punch Pin 5 32 inch 9 4258 3 8 inch to 1 2 inch Adapt...

Страница 176: ...it 2113015 For 120V and 220V Units Anti Static Kit 46 194427P231 46 194427P279 46 194427P369 46 194427P373 46 194427P370 Kit includes anti static mat wrist strap and cables for 200 to 240 V system 3M 2204 Large adjustable wrist strap 3M 2214 Small adjustable wrist strap 3M 3051 conductive ground cord Anti Static Vacuum Cleaner 46 194427P278 46 194427P279 120V 230V Safety Analyzer 46 285652G1 DALE ...

Страница 177: ...ns 3 Power up Turn the system power on and verify that all fans and peripherals turn on Watch the displays during power up to verify that no warning or error messages are displayed 4 Probes Verify that the system properly recognizes all probes 5 Displays Verify proper display on the monitor 6 Presets Take printout of all customer presets as a backup Table 10 6 System Preliminary Checks St a t e RE...

Страница 178: ...cifications Control Panel Test Perform the Control Panel Test Procedure see section 7 2 3 on page 7 9 to verify that all keyboard controls are OK This is performed by the internal PC backend processor which does a normal keyboard run through Monitor Verify basic Monitor display functions Refer to Chapter 3 of the User Manual Measurements Use the measurement controls to verify distance and area cal...

Страница 179: ...n Functional Checks Step Item Description 1 Unplug Cord Disconnect the mains cable from the wall and system 2 Inspect Inspect it and its connectors for damage of any kinds 3 Verify Verify that the LINE NEUTRAL and GROUND wires are properly attached to the terminals and that no strands may cause a short circuit 4 Verify Inlet connector retainer is functional Table 10 9 Mains Cable Inspection Step I...

Страница 180: ...dents scratches or cracks 3 Control Panel Inspect keyboard and control panel Note any damaged or missing items 4 Control Panel Movement Verify ease of control panel Operator I O Panel movement in all acceptable directions Ensure that it latches in position as required 5 Cables Connectors Check all internal cable harnesses and connectors for wear and secure connector seating Pay special attention t...

Страница 181: ...safety evaluation of cord connected electrically operated patient care equipment If additional information is needed refer to the NFPA 99 For USA and IEC 60601 1 documents THE USER MUST ENSURE THAT THE SAFETY INSPECTIONS ARE PERFORMED AT LEAST EVERY 12 MONTHS ACCORDING TO THE REQUIREMENTS OF THE PATIENT SAFETY STANDARD IEC EN 60601 1 ONLY TRAINED PERSONS ARE ALLOWED TO PERFORM THE SAFETY INSPECTIO...

Страница 182: ...ve leakage current To minimize the risk that a probe may shock someone the customer should Not use a probe that is cracked or damaged in any way Check probe leakage current once a year on surface probes twice a year on endocavitary probes whenever probe damage is suspected St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u...

Страница 183: ...ent device Country Normal Condition Open Ground Reverse Polarity Open Neutral USA N A 0 3 mA 0 3 mA N A Other 0 1 mA 0 5 mA 0 5 mA 0 5 mA Table 10 13 Chassis Leakage Current Limits Accessible Metal Surfaces Country Normal Condition Open Ground Reverse Polarity Open Neutral Mains Applied USA 0 05 mA 0 05 mA 0 05 mA 0 05 mA N A Other 0 1 mA 0 5 mA 0 5 mA 0 5 mA 5 0 mA Table 10 14 Type BF Applied Par...

Страница 184: ...s Note No outlet tester can detect the condition where the Neutral grounded supply conductor and the Grounding protective earth conductor are reversed If later tests indicate high leakage currents this should be suspected as a possible cause and the outlet wiring should be visually inspected Figure 10 1 Typical Alternate Outlet Tester Figure 10 2 Dale 600 Outlet Test Combination of Lights Conditio...

Страница 185: ... cable into the meter s CHASSIS connector and attach the black chassis cable clamp to an exposed metal part of the LOGIQ 100 PRO unit 4 Set the meter s FUNCTION switch to the RESISTANCE position 5 Set the meter s POLARITY switch to the OFF center position 6 Measure and record the ground wire resistance Electric Shock Hazard The patient must not be contacted to the equipment during this test Figure...

Страница 186: ...strument its power plug may be inserted into the wall outlet and the equipment under test is plugged into the receptacle on the panel of the meter This places the meter in the grounding conductor and the current flowing from the case to ground will be indicated in any of the current ranges The maximum allowable limit for chassis source leakage is shown in Table 10 13 Electric Shock Hazard When the...

Страница 187: ...to an exposed metal part of the LOGIQ 100 PRO 4 Set the tester s FUNCTION switch to CHASSIS position 5 Follow the test conditions described for respective test points shown in Table 10 16 6 Keep a record of the results with other hard copies of PM data kept on site Figure 10 5 Ground and Chassis Leakage Current Test Chassis Cable Clamp Normal Reverse Polarity Neutral Open Closed Functions Selector...

Страница 188: ...rew Test 2 Rear Panel Optional Test 4 Optional Test 5 Enter Name of tested peripheral here ON NORM OPEN ON NORM CLOSED ON REV OPEN ON REV CLOSED OFF NORM OPEN OFF NORM CLOSED OFF REV OPEN OFF REV CLOSED Table 10 17 Typical Data Sheet for Chassis Source Leakage Current St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j ...

Страница 189: ...to the water making it conductive Normal saline solution is 0 9 salt or 1 2 gram salt per 1 liter of water If saline is not available a mixture of 1 quart of water with one or more grams of table salt mixed thoroughly will substitute Follow these steps to test each probe for leakage current 1 Turn the LOGIQ 100 PRO unit OFF 2 Plug the unit s mains powercord into the test meter and plug the test me...

Страница 190: ...ions described in Table 10 18 for every probe 10 Keep a record of the results with other hand copies of Planned Maintenance data St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o ...

Страница 191: ...tested with the meter s appropriate adapter 4 Plug the saline probe into the test meter s CHASSIS connector 5 Plug the probe adapter into the test meter s connector marked EXTERNAL 6 Set the meter s FUNCTION switch to EXTERNAL position 7 Put the saline probe and the probe s face imaging area of the probe into the saline bath CAUTION To avoid probe damage and possible electric shock do not immerse ...

Страница 192: ...ing them using the POLARITY switch and or the NEUTRAL switch Otherwise the unit may be damaged Probe Tested Unit Power Tester Power Polarity Switch Tester GROUND or NEUTRAL Switch Measurement ON NORM OPEN ON NORM CLOSED ON REV OPEN ON REV CLOSED OFF NORM OPEN OFF NORM CLOSED OFF REV OPEN OFF REV CLOSED Table 10 18 Typical Data Sheet For Probe Source Leakage Current St a t e RELEASE Do c u m e n t ...

Страница 193: ... are normal from probe to probe Other variations will result from differences in line voltage and test lead placement The maximum allowable leakage current for body surface contact probe differs from inter cavity probe Be sure to enter the correct probe type in the appropriate space on the check list If excessive leakage current is slot dependent inspect the system connector for bent pins poor con...

Страница 194: ... Scan Format Model Number Serial Number Probe 4 Frequency Scan Format Model Number Serial Number Probe 5 Frequency Scan Format Model Number Serial Number Probe 6 Frequency Scan Format Model Number Serial Number Probe 7 Frequency Scan Format Model Number Serial Number Probe 8 Frequency Scan Format Model Number Serial Number Probe 9 Frequency Scan Format Model Number Serial Number Functional Check i...

Страница 195: ...ge Lead to Lead Patient Lead Source Leakage Isolation Peripheral 1 Leakage Current Peripheral 1Ground Continuity Peripheral 2 Leakage Current Peripheral 2Ground Continuity Peripheral 3 Leakage Current Peripheral 3Ground Continuity PROBES Probe Number from previous page Max Value Allowed Max Value Measured OK Comments Probe 1 Probe 2 Probe 3 Probe 4 Probe 5 Probe 6 Probe 7 Probe 8 Probe 9 St a t e ...

Страница 196: ...s St a t e RELEASE Do c u m e n t i s r e l e a s e d a n d u n d e r f o r m a l Ch a n g e Co n t r o l Ch a n g e s a r e s u b j e c t t o t h e ECR E CO Pr o c e s s Se e t h e GEHC My w o r k s h o p Sy s t e m t o d e t e r m i n e t h e s t a t u s o f t h i s d o c u m e n t ApprovedDocument 5305880 100TPH_r3 pdfPage197of197 ...

Отзывы: