K0467 Revision A
9
[EN] English
Figure 4 Sealing Hydraulic Connections
3.9 Hydraulic connections
Note:
Pressure connections greater than 210 bar are 9/16” 18UNF Male Autoclave.
1. Switch off the power supply before connecting or disconnecting the instrument.
2. Use the applicable sealing method for all pressure connections.
3. Isolate the hydraulic pressures and de-pressurise the pipes before connecting or
disconnecting the instrument.
3.10 Pressure input (Figure 2)
1. Make sure the user systems can be isolated and vented.
2. Use the applicable sealing method for all pressure connections.
3. The hydraulic liquid must be clean, refer to specification given in the data sheet.
4. Connect the Unit Under Test (UUT) to the appropriate connection port.
5. Fill and bleed the UUT and connecting pipes.
4 Mounting kits
4.1 Rack-mount option (Figure 5)
There must be enough space at the rear of the instrument for all the cables and pipes. The length
of the cables and pipes must allow for the removal and installation of the instrument. The cooling
air of the instrument must not be obstructed. Allow a free flow of air through the equipment rack
and around the instrument, especially at high ambient temperatures.
Connection
Input
ISO228/1 G 1/8 parallel threads (DIN ISO228/1, JIS B0202)
Reference
ISO228/1 G 1/8 parallel threads (DIN ISO228/1, JIS B0202)
ISO 228 G1/8
ISO 228 G1/8
bonded seal
bonded seal
Recommended method
Alternative method below 100 bar
Содержание Druck PACE1000
Страница 38: ...K0467 R vision A 19 FR Fran ais...
Страница 112: ...K0467 Revis o A 19 PT Portugu s...
Страница 113: ...GE Digital Solutions K0467 A PACE General Electric Company 2010 GE General Electric Company GE...
Страница 119: ...RU 6 K0467 A 2 4 3 1 2 NPT 2 3 3 3 1 1 25 MWP 3 2 210 3000 2 1 1 2...
Страница 121: ...RU 8 K0467 A 3 6 210 3000 3 7 3 8 1 1 25 MWP 2 NPT...
Страница 123: ...RU 10 K0467 A 5 1 1 2 M3 x 6 2 M3 x 8 3 4 5 6 7 8 9 4 2 6...
Страница 124: ...K0467 A 11 RU 6 1 1 2 3 1 4 5 6 2 5 GE 191 370...
Страница 128: ...K0467 A 15 RU 6 5 8 1 2 3 4 IEEE 488 5 Supervisor Setup communications K0470 6 7 1 2 3...
Страница 129: ...RU 16 K0467 A 8 IEEE 488 IEEE 488 1 6 7 8 9 15 1 5 9 2 654 71 5 1 4 1...
Страница 130: ...K0467 A 17 RU 7 GE www gemeasurement com RMA RGA RMA PACE1000 GE 8 www gemeasurement com...
Страница 131: ...GE Digital Solutions K0467 A PACE 2010 General Electric Company GE General Electric Company GE...
Страница 137: ...ZH 6 K0467 A 2 4 3 1 2 UUT NPT 2 3 3 3 1 1 25 x MWP 3 2 210 bar 3000 psi 2 1 1 2...
Страница 139: ...ZH 8 K0467 A 3 6 210 bar 3000 psi 3 7 3 8 1 1 25 x MWP 2 NPT...
Страница 141: ...ZH 10 K0467 A 5 1 1 2 M3 x 6 2 M3 x 8 3 4 5 6 7 8 9 4 2 6...
Страница 142: ...K0467 A 11 ZH 6 1 1 2 3 1 4 5 6 2 5 GE 191 370...
Страница 146: ...K0467 A 15 ZH 6 5 8 1 2 3 4 IEEE 488 5 K0470 6 7 1 2 3...
Страница 148: ...K0467 A 17 ZH 7 GE www gemeasurement com RMA RGA RMA PACE1000 GE COSHH MSDS 8 www gemeasurement com...