7
Installation
7
7..6
6..6
6 C
Ch
he
ecckk T
Th
he
e IIn
ntte
errn
na
all M
Me
ed
diia
a S
Sh
hu
un
ntt V
Va
allvve
e &
& T
Te
em
mp
pe
erra
attu
urre
e
Verify that the shunt valve is working and operating as it should.
1. Press M
Me
en
nu
u.
2. Press S
Se
errvviicce
e P
Pa
ag
ge
e.
3. Press H
Ha
arrd
dw
wa
arre
e S
Stta
attu
uss.
4. Close the cooling media inlet (2).
5. Check that the shunt valve moves visually on the
Cooling System.
6. Check the indicator for S
Sh
hu
un
nttV
Va
allvve
eW
Wa
atte
errM
Miixx in EBM
Control.
1
10
00
0%
%
= Full by-pass
0
0%
%
= No by-pass
7. Watch over time (about 15 min) when the internal
temperature rises, the shunt value should then
change.
8. When the external cooling media valves are opened
again, the shunt valve should adjust back.
9. The temperature should then stabilise at about
2
25
5 °°C
C.
10. Fill in the value in the IIn
nsstta
alllla
attiio
on
n C
Ch
he
ecckklliisstt (IC).
76
01
IM-710429
en-GB
Содержание ArcamEBM Spectra H
Страница 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Страница 2: ...This page is intentionally left blank...
Страница 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Страница 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Страница 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Страница 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Страница 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...
Страница 56: ...7 Installation 7 7 4 4 1 1 2 2 L Lo ow we er r C Ca ab blle e P Po or rt t 52 01 IM 710429 en GB...