7
Installation
7
7..5
5..8
8 C
Ch
he
ecckk T
Th
he
e H
He
elliiu
um
m P
Pa
an
ne
ell O
Ou
uttlle
ett P
Prre
essssu
urre
e
Check that the helium panel outlet pressure (3) is the same pressure shown as H
He
eIIn
nlle
ettL
Liin
ne
eP
Prre
essssu
urre
e in
EBM Control.
1. Open the rear door to gain access to the pressure
regulator.
1. Helium supply pressure
2. Locking nut / Adjustment screw
3. Helium panel outlet (internal) pressure
2. Verify that the helium outlet (internal) pressure (3)
is set to 0
0..8
8 b
ba
arr ±
±10% on the pressure gauge. If ad-
justment is needed, see 7.5.7
.
3. Check that the locking nut is tightened (the black
knob is removed in this figure, just to display the
locking nut).
4. Fill in the value in the IIn
nsstta
alllla
attiio
on
n C
Ch
he
ecckklliisstt ((IIC
C)) //
F
FS
SE
E P
PM
M R
Re
ep
po
orrtt.
5. Press M
Me
en
nu
u.
6. Press S
Se
errvviicce
e P
Pa
ag
ge
e.
66
01
IM-710429
en-GB
Содержание ArcamEBM Spectra H
Страница 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Страница 2: ...This page is intentionally left blank...
Страница 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Страница 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Страница 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Страница 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Страница 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...
Страница 56: ...7 Installation 7 7 4 4 1 1 2 2 L Lo ow we er r C Ca ab blle e P Po or rt t 52 01 IM 710429 en GB...