7
7..6
6..5
5 T
Te
esstt T
Th
he
e IIn
ntte
errn
na
all C
Co
oo
olliin
ng
g M
Me
ed
diia
a F
Fllo
ow
w S
Sw
wiittcch
h
Verify that the internal cooling media flow switch is working.
1. Flow sensor
2. Adjustable sensor
3. Adjustment screw
4. Indicator glass
5. Shuttle
1. Verify that there is a flow through the column circuit
by looking on the internal shuttle (5) in the sensor.
2. Verify that the internal media flow switch is set to
give an alarm if the flow rate is less than 0
0..5
5 ll//m
miin
n.
3. Close the Ballofix valve mounted on the flow switch.
4. Check that an alarm is raised on the A
Alla
arrm
mss p
pa
ag
ge
e
in the EBM Control.
5. Press M
Me
en
nu
u.
6. Press S
Se
errvviicce
e P
Pa
ag
ge
e.
7. Press H
Ha
arrd
dw
wa
arre
e S
Stta
attu
uss.
8.
The indicator labelled F
Fllo
ow
w C
Co
ollu
um
mn
n T
TP
P C
Ciirrccu
uiitt
should turn grey.
9. Open the valve
01
IM-710429
en-GB
75
Содержание ArcamEBM Spectra H
Страница 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Страница 2: ...This page is intentionally left blank...
Страница 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Страница 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Страница 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Страница 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Страница 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...
Страница 56: ...7 Installation 7 7 4 4 1 1 2 2 L Lo ow we er r C Ca ab blle e P Po or rt t 52 01 IM 710429 en GB...