RTfino/RT3200 Advantage–II/RT–x200 SERVICE MANUAL
GE MEDICAL SYSTEMS
P9030GX
INSTALLATION AND REPLACEMENT
3–19
REV 21
3–7–5 ECG Leakage Current Test (Continued)
5.
Set the meter’s ”FUNCTION” switch to LEAD TO GROUND position to measure the patient lead to ground leak-
age current.
6.
Select and test each ECG lead positions (except ALL) of the LEAD selector, testing each to the power condition
combinations shown in TABLE 3–7.
TABLE 3–7
TESTING POWER CONDITIONS
ECG
Meter’s
Meter’s
Power
Polarity
Neutral
Switch
Switch
ON
NORM
CLOSED
ON
NORM
OPEN
ON
REVERSE
CLOSED
ON
REVERSE
OPEN
OFF
NORM
CLOSED
OFF
NORM
OPEN
OFF
REVERSE
CLOSED
OFF
REVERSE
OPEN
7.
Record the patient lead to ground leakage current measured on the data sheet (Refer to TABLE 3–9).
8.
Set the meter’s ”FUNCTION” switch to LEAD TO LEAD position to measure the lead to lead leakage current.
9.
Select and test each ECG lead positions (except ALL) of the LEAD selector, testing each to the power condition
combinations shown in TABLE 3–7.
10. Record the lead to lead leakage current measured on the data sheet (Refer to TABLE 3–9).
11. Set the meter’s ”FUNCTION” switch to LEAD ISO position to measure the patient lead isolation current.
12. Select and test each ECG lead positions (except ALL) of the LEAD selector, testing each to the power condition
combinations shown in TABLE 3–7.
13. Depress the rocker switch to ISO TEST and read the isolation current. To apply the voltage to the lead safely, the
voltage is only applied when the rocker switch is depressed to ISO TEST.
14. Record the patient lead isolation current measured on the data sheet (Refer to TABLE 3–9).