background image

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Electrical Connections 

O

PERATORS

:- 

 

20mm conduit for mains voltage and conduit for low voltage cabling can enter from either side (see cut out 
positions on cover) or preferably from the spacing between plate & operator cover. 

 

Wire the mains voltage cabling straight to the motor terminals and connect both the shield and earth to the 
earth terminal. 

 

Wire the low voltage cables to the door switch. If the cabling run is over 8m, connect the shield to the earthed 
chassis.

 

 
Connections to Control Board 

Supply 

Connect a 10A 240v  non earth leakage protected power supply to Din Rail terminals labelled A & N 
Connect earth to the earth Din Rail 

Motor Wires 

Connect the shielded motor cable to Inverter terminals. Connect earth and shield to Earth Stud. 

 

Содержание GDS 550P Series

Страница 1: ...Installation and Maintenance Manual Sliding Gate Operators Models GDS 550P 750P Range Made in Australia from Australian quality imported components MOVITRAC B A B N 62 059 806 405 April 2010 N14870 ...

Страница 2: ...ion wheel Once the rack is fixed move the gate and sight the rack moving over the pinion wheel check that most of the pinion wheel meshes with the rack Make sure rack runs freely over the pinion wheel any tights spots should be corrected by adjusting the rack height Check the operator is firmly bolted down to the concrete pad Ensure stops are installed on the gate for the fully closed and fully op...

Страница 3: ...utomatically fully close During this commissioning the PE beam and Door inputs are not required Once the gate is commissioned gate has fully closed the gate distance is in the memory of the inverter the Door and PE beam inputs need to be connected Give a pulse input to the open terminal and the gate will open note The gate will perform one slow speed operation to confirm the gate opening distance ...

Страница 4: ... 11 Electrical Cabling Mechanical Installation Electrical Connections Connections to Control Board Wiring Diagram Variable Speed Drive Unit Variable Speed Drive Unit Key Pad Operation Function Factory Settings Parameter Settings Gate Direction Set Up Commissioning Section 5 Manual Release Instructions Page 12 Section 6 Fault Finding Page 13 Section 7 Maintenance Page 14 Section 8 Warranty Page 15 ...

Страница 5: ...y necessary signs to indicate any danger areas and automatic operation of the gate or door The operators are not designed to be used in any hazardous areas or areas subject to flooding etc All electrical connections and wiring must be performed with AS NZS 3000 2007 as the guidelines Or its counterpart for other countries outside of Australia and New Zealand WARNING ELECTRICITY CAN KILL The manufa...

Страница 6: ...fter reading the previous sections in this manual and having checked for suitable installation proceed as follows Electrical Cabling A suitably rated Isolator and a non earth leakage protected 240v power supply should be available near to where the gate operator control box is to be mounted Conduits cabling preferably to enter through base plate knockout hole Mains voltage and low voltage cabling ...

Страница 7: ... motor terminals and connect both the shield and earth to the earth terminal Wire the low voltage cables to the door switch If the cabling run is over 8m connect the shield to the earthed chassis Connections to Control Board Supply Connect a 10A 240v non earth leakage protected power supply to Din Rail terminals labelled A N Connect earth to the earth Din Rail Motor Wires Connect the shielded moto...

Страница 8: ...4v supply 24V 3A Supply Gate running Output Gate running Output 24V 150mA PE normally closed Door not for field connections OPEN CLOSE Pedestrian COMMON for Pedestrian Open Close P E and Door connections COMMON for Pedestrian Open Close P E and Door connections EARTH Wiring Diagram for Automation Schematic Wiring Diagram for GDS 550P 750P Range ...

Страница 9: ...erating Modes The thumbwheel selector switch is used to select the operation mode which best suits the customers purpose the details of the operational modes are as follows Mode 0 Auto close 1 120 seconds set by the knob on the front of the keypad fully clockwise is 120 second auto close time PE auto close meaning that when the gate is fully open and the photo electric cell beam is broken and then...

Страница 10: ... but can be changed if necessary Similarly the speed that the gate operates at has also been set but can be changed Variable Speed Drive Unit Key Pad Operation The following diagram Figure 1 shows the keys on the key pad which are used to select the various functions please refer to these when reading further instructions Figure 1 The symbols shown in the diagram below Figure 2 correspond to what ...

Страница 11: ... maximum 5000 500 000 operations Note 100 gate operations will be recorded as 1 on the inverter counter Pt 401 Internal serial number for recalibration Pt 450 low current setting usually 60 Selecting a Function To select a function use the up down arrow keys to select corresponding symbol for desired function A LED will light up the symbol and the display will show the programmed settings for that...

Страница 12: ...eached the fully open position the operator is now ready to operate at full speed A potentiometer has also been provided which is found under the cover of the invertor which can be rotated to adjust the gate operation pre warning time clockwise minimum time 0 second and anticlockwise maximum time 5 seconds Press the transmitter or manual control switch to now test the normal operation i e ramp up ...

Страница 13: ...erstanding what each input does will help to clear or rectify any problem relating to the input To see the status of the inputs proceed to parameter 39 via the keypad refer to section on keypad operation for navigating your way there The various strokes relate to the inputs when the stroke is high it means the input is on and when low the input is off This screen can therefore be used to ascertain...

Страница 14: ...commencing maintenance on the operator isolate the electrical supply to ensure operator will not run inadvertently Gate rolls freely Gate guide rollers in good condition Gate stops in good condition Gate rack is tight the correct clearances between pinion wheel rack Gate operator mounting bolts right No oil leaks from gearbox Gearbox mounting bolts nuts tight Inside operator and control box clean ...

Страница 15: ...y in the following circumstances i If no proof of date of purchase can be produced ii If the product has been used in a manner beyond its design parameters iii If the product is tampered with or repaired by personnel not authorised to do so iv In respect of loss or damage caused by rough treatment v If the product is not used and maintained in accordance with instructions or recommendations listed...

Отзывы: