Commissioning
•
Tighten knurled knob at back of slider, very firmly, by hand so gate will drive.
•
Power up board and with gate in the half way position, press transmitter or manual control switch
(manufacturer has provided a push button for open/closing/commissioning next to PLC inverter) so operator
drives gate. (Note. for commissioning, a momentary pulse is all that is required)
•
The first pulse must always open the gate, if it does not, then turn off the power and reverse 2 of the motor
wires.
•
Allow the gate to fully open onto the open stop. The gate will then automatically start closing at slow speed;
do not interrupt this auto commissioning cycle as it is determining the gate opening distance.
CAUTION!
Ensure vehicles and personnel do not get in the way of the moving gate as both the
photoelectric cells and door inputs are bypassed during commissioning.
•
Once the gate reaches the fully closed position the invertor will automatically switch the power off to the
motor.
•
The photoelectric/safety devices and door switch wiring will now need to be operational in order for the
operator to function.
•
Install cover onto operator with 4 fixing screws and close manual release door.
•
Press the transmitter or operate the access control, the gate will fully open at slow speed to confirm the gate
opening distance.
•
Once the gate has reached the fully open position, the operator is now ready to operate at full speed
•
A potentiometer has also been provided, which is found under the cover of the invertor, which can be rotated
to adjust the gate operation pre-warning time (clockwise = minimum time = 0 second, and anticlockwise =
maximum time = 5 seconds).
•
Press the transmitter or manual control switch to now test the normal operation, i.e. ramp up, run at fast
speed, ramp down and then slow speed into the open and closed stops.
•
PLEASE NOTE: Each time the gate operator power is turned off or the manual release door is opened, the
gate will run at slow speed to allow the controller to recalculate its position.
•
Check that all safety devices work as designed.
•
Provide full details to the owner concerning the operation and relevant maintenance and
disconnection details in the event of a power failure..
5.
M
A NU A L
R
EL E ASE
I
NS TR UC TIO N S
•
Should the power fail or for some other reason the gate does not operate in the normal motorised manner,
manual disconnection can be achieved by:-
•
Turn power off to the control box and isolate.
•
By using the key, unlock the door on the back of the cover.
•
Turn the large knob anticlockwise which will release the drive
•
Manually slide open the gate.
•
When the operator is to be re-established into electrical operation:
•
Manually slide gate to midway position.
•
Tighten large knob, clockwise, to engage the drive.
•
Lock the door on the cover.
•
Turn Power On.
•
Press the transmitter to operate the gate.
•