9. M
AINTENANCE
D
ETAILS
WARNING!
Failure to maintain equipment may result in injury or death and/or damage to property and
Recommended maintenance to be performed on the operator and gate are as follows:
Operator performs over 150 cycles a day
Operator performs between 100
Operator performs between 50-
Operator performs between 20-
Operator performs under 20 cycles a day
Date: ................................................................
Site Name: ................................................................
Site Address: ................................................................
Before
commencing maintenance on the operator, isolate the electrical supply to ensure
inadvertently.
Gate rolls freely when in manual
Gate wheels and guide rollers in good condition
Gate stops in good condition and not loose
Gate track is not damaged ................................
Gate rack is tight & correct clearance between pinion
Gate operator mounting bolts tight
No oil leaks from gearboxes ................................
Gearbox mounting bolts/nuts tight
Inside operator and control box clean
‘Baygon’ Surface Spray around operator and control box (not on electronics)
All electrical connections tight ................................
Limit Switches operate in appropriate positions
External safety devices work effectively / cleaned
Electromagnetic lock, if fitted, operates correctly & is clean
Wash down of control box and cover (particularly near corrosive
General operation i.e. speed, auto close etc normal
Comments ................................................................
................................................................................................
Service performed by ................................
ETAILS
Failure to maintain equipment may result in injury or death and/or damage to property and
Recommended maintenance to be performed on the operator and gate are as follows:-
Operator performs over 150 cycles a day
each month
Operator performs between 100-150 cycles a day
every 2 month
-99 cycles a day
every 4 months
-49 cycles a day
every 6 months
Operator performs under 20 cycles a day
every 12 months
..............................................................
................................................................................................
................................................................................................
commencing maintenance on the operator, isolate the electrical supply to ensure operator will not run
when in manual ................................................................................................
guide rollers in good condition ................................................................
and not loose ................................................................
................................................................................................
Gate rack is tight & correct clearance between pinion wheel & rack ................................
ight................................................................................................
................................................................................................
Gearbox mounting bolts/nuts tight ................................................................................................
Inside operator and control box clean ............................................................................................
‘Baygon’ Surface Spray around operator and control box (not on electronics) .............................
................................................................................................
Limit Switches operate in appropriate positions ................................................................
External safety devices work effectively / cleaned ................................................................
Electromagnetic lock, if fitted, operates correctly & is clean ........................................................
Wash down of control box and cover (particularly near corrosive/sea environments
General operation i.e. speed, auto close etc normal ................................................................
................................................................................................
................................................................................................
..................................................................................................
12
Failure to maintain equipment may result in injury or death and/or damage to property and equipment
.........................................................
.....................................................
operator will not run
...................................
...........................................
....................................................
..............................................
............................................
.................................
..........................................
.................................
............................
.............................
.......................................
............................................
........................................
........................
/sea environments ...................
.......................................
.........................................................
...........................................
Содержание GDS 240 PP
Страница 10: ......