Repairs/Adjustments
08/20/2015
GBC AdvancedPunch Pro
4-114
Installation Procedure
1. Place the new Die Rail Assembly in position.
2. Place the Chip Chute in position and tighten the Nuts (3).
3. Place the Springs (2) in position, install the M2 Lock Washers (4), and
tighten the the M2 Screws (4).
4. Install all brackets from both sides.
5. Place the the Die Rail Assembly in position.
6. Install and tighten the Screws (4) that hold that Die Rail Assembly.
When installing (4) screws that hold the die rail, use 3mm reference
holes for positioning the part. A 3mm pin can be inserted to hold the
part in position while the screws are tightened.
7. Tighten the Screws (2) that hold the Dieset Recognition Bracket.
8. Connect the Alignment Sensor Board and place the wires in the
Cable Clamps.
9. Connect the Back Gage Sensor Board and place the wires in the
Cable Clamps.
10. Do REP 3.1 to install the Punch Module.
11. Do REP 1.6 to install the Rear Cover.
12. Install the Die Set (see Operator Manual).
13. Connect the Power Cord.
14. Power ON the entire printing system.
Содержание AdvancedPunch Pro
Страница 26: ...Service Call Procedures 08 20 2015 GBC AdvancedPunch Pro 1 8 Notes ...
Страница 28: ...GBC AdvancedPunch Pro 11 07 2018 RAPS 2 2 ...
Страница 78: ...Punch Quality 11 07 2018 GBC AdvancedPunch Pro 3 2 This page intentionally left blank ...
Страница 230: ...Repairs Adjustments 08 20 2015 GBC AdvancedPunch Pro 4 142 Notes ...
Страница 263: ...GBC AdvancedPunch Pro 09 11 2018 Parts List 5 33 PL 6 4 Wiring Drawing OEM Configurations ...
Страница 264: ...Parts List 09 11 2018 GBC AdvancedPunch Pro 5 34 PL 6 5 Wiring Drawing DFA Configurations ...
Страница 275: ...GBC AdvancedPunch Pro 09 11 2018 General Procedures and Information 6 5 User Interface Screen Map ...
Страница 297: ...GBC AdvancedPunch Pro 09 11 2018 General Procedures and Information 6 27 Service Interface Screen Map ...
Страница 359: ...GBC AdvancedPunch Pro 09 11 2018 General Procedures and Information 6 89 This page intentionally left blank ...
Страница 360: ...General Procedures and Information 09 11 2018 GBC AdvancedPunch Pro 6 90 Notes ...
Страница 362: ...Wiring Data 08 20 2015 GBC AdvancedPunch Pro 7 2 This page intentionally left blank ...
Страница 363: ...GBC AdvancedPunch Pro 08 20 2015 Wiring Data 7 3 System Wiring ...
Страница 364: ...Wiring Data 08 20 2015 GBC AdvancedPunch Pro 7 4 System Wiring DFA Configurations ...
Страница 365: ...GBC AdvancedPunch Pro 08 20 2015 Wiring Data 7 5 Plug Jack Connectors ...
Страница 366: ...Wiring Data 08 20 2015 GBC AdvancedPunch Pro 7 6 Plug Jack Connectors DFA Configurations ...
Страница 367: ...GBC AdvancedPunch Pro 08 20 2015 Wiring Data 7 7 Notes ...
Страница 368: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 1 8 Installation Instructions ...
Страница 369: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 2 ...
Страница 370: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 3 ...
Страница 371: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 4 ...
Страница 372: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 5 ...
Страница 373: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 6 ...
Страница 374: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 7 ...
Страница 375: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 8 ...
Страница 376: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 9 ...
Страница 377: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 10 ...
Страница 378: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 11 ...
Страница 379: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 12 ...
Страница 380: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 13 ...
Страница 381: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 14 ...
Страница 383: ...Installation Instructions DFA 08 20 2015 GBC AdvancedPunch Pro 8 2 This page intentionally left blank ...