ClearAir RSPC-ESP
Start-Up Inspection Report
This start-up Report Used For RSPC Pollution Control Units One Report Must Be Completed For Each Control Cabinet
File Number
_________________________________________________
Job Name
_________________________________________________
Address
_________________________________________________
_________________________________________________
NAMEPLA
TE DA
TA:
Model No
_________________________________________________
Serial No
_________________________________________________
ESP
CFM
_________________________________________________
____________________________________________________________________
PRELIMINAR
Y CHECKLIST
UNIT
EQUIPPED WITH EXHAUST
F
AN?
Y
es
No
UNIT
EQUIPPED WITH ODOR CONTROL?
Y
es
No
ALL
UNITS:
1.
Open all removable access panels including electrical
disconnect panel.
2.
Complete a thorough inspection of the unit for any ship
-
ping, handling or installation damages and, if any
, note
under comments.
3.
V
erify that the debris screen and any other filters are in place and free of debris. See submittal drawing for details
4.
V
erify all ESP
cells are in place and properly connected..
5.
V
erify that the hot water piping is connected to the HW inlet connection..
6.
V
erify that the drain line is connected and that its size is equal to or larger than the RSPC drain outlet. Check that the drain is trapped.
7.
V
erify that the spare fuses are provided inside the electri
-
cal disconnect panel.
IF UNIT EQUIPPED WITH EXHAUST F
AN:
8.
V
erify that the wall insulation is secure and has not loos
-
ened in shipment.
9.
V
erify that all shipping tiedowns, bolts and braces have been removed from exhaust fan spring isolators.
10.
V
erify that the fan floats freely on the spring isolators and
the fan wheel turns freely by rotating the pulleys.
11.
V
erify that all bearing set collars are tight.
12.
V
erify the exhaust discharge is not obstructed or di
-
crected toward any structure.
13.
V
erify that the spare fan belts are provicded inside the
fan housing.
IF UNIT IS EQUIPPED WITH MEDIA BED ODOR CONTROL:
14.
V
erify all modules are in place and full of odor control
media.
15.
V
erify that all filters, debris screens and moisture separa
-
tors are in place.
16.
T
ype of odor control media bed
carbon
potassium
17. Unit equipped with a fire protection system?
yes
No
If so, what type?
Sprinkler
W
et Chemical
OPERA
TIONAL
CHECKLIST
ESP
SECTION
1.
Close and latch all access doors & panels.
2.
V
erify that all circuit breakers are on and power is sup
-
plied to the RSPC.
3.
Place the door disconnect switch in the “On” position.
4.
Push the “Start Fan” button on the control cabinet to
energize the ESP
cells and exhaust fan:
a. Exhaust Fan start?
Y
es
No
b. Cell power pack lights on?
Y
es
No
FAN SECTION
(if equipped
1.
V
erify that the exhaust fan rotates in the proper direction.
W
ASH SEQUENCE
1.
Push
the
"Start
W
ash"
buotton
located
on
the
Control
Cabinet
and check the following:
a.
Exhaust fan shut of
f?
Y
es
No
b.
W
ater turned on?
Y
es
No
c.
Detergent pump on?
Y
es
No
d.
Any RSPC unit leaks?
Y
es
No
e.
Drains free and clear?
Y
es
No
f.
Cleaning cycle length
_________Minutes
g.
Delay cycle length
_________Minutes
h.
W
ater pressure
_________PSI
i.
W
ater temperature
_______________
j.
Brand of detergent used
_______________
k.
Number of spare cells
_______________
l.
Number of soak tanks
_______________
m.
Location of spare ESP
cell(s) and soak tank(s):
___________________________________________
___________________________________________
FIRE
TEST
1. With the venitlator on, open electrical compartment on Con
-
trol Cabinet and push the "Fire
Test" button.
a.
Exhaust fan shut of
f?
Y
es
No
b.
All nozzles in ESP
spraying?
Y
es
No
Personnel provided with technical manual?
Y
es
No
SPRA
Y ODOR (If equipped with)
Date of Inspection:
___________________________
Inspection Witnessed By: Name:
_____________________________________
Title:
______________________________________
Signature:
__________________________________
Inspection Performed By:
Name:
_____________________________________
Company:
__________________________________
___________________________________________ Comments ___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________ ___________________________________________
Distribution: Gaylord Industries, Inc. / Customer / Sales Rep
GA
YLORD INDUSTRIES, INC.
, PO BOX 1
149
Tualatin, OR 97062-1
149 • 1-800-547-9696 • F
AX: 503-692-6048 • email: [email protected]
1.
Locate container of GS-710
2.
Place GS-710 container in the spray odor cabinet
3.
Remove cap and install pickup tube and level switch in
container
4.
V
erify that both timers are set to 15 seconds
This may need to be adjusted to maximize the spray odor ef
fec
-
tiveness decreasing the delay or increasing the spraying time will improve the ef
fectiveness of the spray odor
. Increasing the
delay or decreasing the spray time will reduce the ef
fectiveness
of the spray odor system.
___________________________________________
Facility Contact Name
_________________________________________________________________
CSA Contact PD
________________________________________________________________
___________________________________________________________________________________
Содержание ClearAir RSPC-ESP SERIES
Страница 9: ...9 TYPICAL INSTALLATION ...
Страница 46: ...46 PARTS DETERGENT PUMP 45 PARTS DETERGENT PUMP ...
Страница 53: ...53 C 6000 ESP INTERNAL WIRING DIAGRAM ...
Страница 56: ...56 RSPC ESP DRAIN ...
Страница 57: ...57 SPRAY ODOR WIRING ...
Страница 59: ...59 1 2 3 4 5 6 7 8 9 10 11 12 13 14 20 19 18 17 16 15 MODEL C 6000 ESP S SERIES CONTROL 1 3 TRANSFORMERS ...
Страница 61: ...61 1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 MODEL C 6000 ESP S SERIES CONTROL 4 OR MORE TRANSFORMERS ...
Страница 68: ...INTENTIONALLY LEFT BLANK ...