54
OPTIONAL CONNECTION INSTRUCTIONS
Option #1: Disable wash solenoid during an Internal
or External Fire.
This action can be performed By Installing a Jumper wire between
Terminal 21 and 22. This is a 24VDC connection. This option has
been installed in the case the local codes or if the Fire Marshal has
specified that the water wash in the hood plenum or the ESP unit
can not turn on in the event of an Internal or External Fire Mode.
Option #2: Start Wash Permission from a remote location.
This option is to be used if the C-6000-ESP control is to commu-
nicate with the building management system or any other system/
control that has control over the fan. The exhaust fan must be shut
down when the wash is running, if the C-6000-ESP control must
wait until the whole system is shut down to start washing then
connect terminals 21 and 23 to a set of voltage free N/C contacts
that open when the wash can start. Example of operation: If the
wash button has been pressed or the time clock has activated
the wash sequence the C-6000-ESP control will call for the fan to
be off by taking the power off of terminals 8 and 5 or opening the
contacts between EF1 and EF2. Next, the C-6000-ESP control
will sit idle until the contacts at the building management system
open. Then the C-6000-ESP control will start the wash cycle.
Option #3: Start Fan Signal from a remote location.
If the C-6000-ESP control is controlled by the building manage-
ment system or another control cabinet that initiates the fan run
signal. This can be accomplished by connecting a set of N/O
voltage free contacts that close when the fan should be on, and
open when the fan should be off to terminals 21 and 24 in the
C-6000-ESP control panel. This will not Initiate the wash mode
when the contacts open. This option should be used in conjunc-
tion with option #4 Start wash signal from a remote location. If
the wash must start when the Contacts Open then use option #5.
Option #4: Start Wash Signal from a remote location.
If the C-6000-ESP control is controlled by the building manage-
ment system or another control cabinet that initiates the wash
on signal. This can be accomplished by connecting a set of
N/O voltage free contacts that close when the wash should be on
and open when the fan should be on,( Note this contact closure
should be a momentatily closure) to terminals 21 and 25 in the
C-6000-ESP control panel. This will not Initiate the fan mode when
the contacts open. This option should be used in conjunction with
option #3 Start Fan signal from a remote location. If the wash
must start when the contacts open then use option #5. (Note:
Once the wash has started the fan will not turned back on until
the wash is finished.)
Option #5: Start Fan/Start Wash Signal from a remote
location.
If the C-6000-ESP control is controlled by the building manage-
ment system or another control cabinet that initiates the fan on /
wash on signal then connect a set of dry contacts that close if the
fan should be on and open when the wash is to start to terminals
21 and 27. These contacts should stay open until the fan should
start. (Note: Once the wash has started the fan will not turn back
on until the wash is finished.)
Содержание ClearAir RSPC-ESP SERIES
Страница 9: ...9 TYPICAL INSTALLATION ...
Страница 46: ...46 PARTS DETERGENT PUMP 45 PARTS DETERGENT PUMP ...
Страница 53: ...53 C 6000 ESP INTERNAL WIRING DIAGRAM ...
Страница 56: ...56 RSPC ESP DRAIN ...
Страница 57: ...57 SPRAY ODOR WIRING ...
Страница 59: ...59 1 2 3 4 5 6 7 8 9 10 11 12 13 14 20 19 18 17 16 15 MODEL C 6000 ESP S SERIES CONTROL 1 3 TRANSFORMERS ...
Страница 61: ...61 1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 MODEL C 6000 ESP S SERIES CONTROL 4 OR MORE TRANSFORMERS ...
Страница 68: ...INTENTIONALLY LEFT BLANK ...