![GAYLORD CG3-UVi-SPC Series Скачать руководство пользователя страница 115](http://html.mh-extra.com/html/gaylord/cg3-uvi-spc-series/cg3-uvi-spc-series_technical-manual_570445115.webp)
___________________________________________________Chapter 6 – Testing and Repair, Page 6-47
Testing Voltages at the Spark Plug Terminal Clips
A ladder is provided as standard equipment for use in testing and removing the ESP Cells. To test the
Voltages at the Spark Plug Clips proceed as follows:
1.
Stop the Exhaust Fan at the Command Center.
2.
For safety purposes turn off the cooking equipment and allow to cool.
3.
Cover any French Fryers to avoid any matter from dropping into the fry pot.
4.
Position the ladder at one end of the Ventilator and hook onto the Ladder Rail with the hooks at the
top of the ladder (Refer to Figure 6-47-1 and 6-48-1).
Extreme Caution: Double check to make sure
the ladder is properly hooked to the Ladder Rail.
5.
There are two or more Access Door Latches. Using a screw driver, unlatch the first latch.
Caution:
Always move the ladder to the remaining latches to unlatch.
Extreme Caution: Before opening the ESP Cell Access Door, note that the ESP Cell wires are hot -
do not touch the wire terminals.
6.
Place the ladder under the Door Hook, open the Access Door and hook open (Refer to Figure 6-47-1).
Ladder Rail
Ladder
Figure 4-47-1
Содержание CG3-UVi-SPC Series
Страница 3: ...Page iii ...
Страница 6: ...Page vi This Page Intentionally Left Blank ...
Страница 136: ...Figure 8 1 1 Typical UVi and SPC Internal Wiring ...
Страница 157: ...Form TM CG3 UVi SPC Rev 04 0516 20934 Copyright 2016 Litho in USA ...